Circle K - Zephyrhills

Project Files

  • Specifications
    • Concrete Specifications - 05.09.25.pdf Uploaded: 5/9/2025 (1864 kb)
    • Geotech Report - 03.07.24.pdf Uploaded: 5/9/2025 (7959 kb)
    • Phase I Environmental Site Assessment Report - 10.23.23.pdf Uploaded: 5/9/2025 (17364 kb)
    • Protected Species Report - 10.16.23.pdf Uploaded: 5/9/2025 (6150 kb)
    • Responsibility Matrix - 05.09.25.pdf Uploaded: 5/9/2025 (120 kb)
    • Site Investigation Report - 06.05.23.pdf Uploaded: 5/9/2025 (4512 kb)
    • Wetland Delineation Report - 06.25.24.pdf Uploaded: 5/9/2025 (3866 kb)
  • Drawings
    • CAD Files
      • Textures
        • Concrete.Cast-In-Place.Flat.Grey.1 Uploaded: 5/9/2025 (23 kb)
        • Concrete.Cast-In-Place.Flat.Grey.1-1 Uploaded: 5/9/2025 (23 kb)
      • FDOT
        • C-FDOT-LAYT Uploaded: 5/9/2025 (6983 kb)
      • Data Link Files
        • SITE DATA TABLE-1 Uploaded: 5/9/2025 (2 kb)
      • PlotCfgs
        • ColliersC3d Uploaded: 5/9/2025 (2 kb)
        • ColliersC3d-1 Uploaded: 5/9/2025 (2 kb)
        • ColliersC3d-2 Uploaded: 5/9/2025 (2 kb)
        • ColliersC3d-3 Uploaded: 5/9/2025 (2 kb)
        • DWG To PDF Uploaded: 5/9/2025 (4 kb)
        • DWG To PDF-1 Uploaded: 5/9/2025 (4 kb)
        • DWG To PDF-2 Uploaded: 5/9/2025 (4 kb)
        • DWG To PDF-3 Uploaded: 5/9/2025 (4 kb)
      • Design
        • C-DSGN-CORR Uploaded: 5/9/2025 (5253 kb)
      • A1-3 DIM Floor Plan Uploaded: 5/9/2025 (1209 kb)
      • A1-3 DIM Floor Plan Uploaded: 5/9/2025 (2 kb)
      • A1-4 Equipment plan Uploaded: 5/9/2025 (1201 kb)
      • A1-4 Equipment plan Uploaded: 5/9/2025 (1 kb)
      • ARCH-5650-23368CKZEPHYRHILLS_hunter-roweNX445-Circle-KLogo-31984059 Uploaded: 5/9/2025 (19 kb)
      • ARCH-5650-23368CKZEPHYRHILLS_hunter-roweNX445-rdc.TitleblockLogoReston-31984051 Uploaded: 5/9/2025 (45 kb)
      • C-BASE Uploaded: 5/9/2025 (3309 kb)
      • C-DSGN-CORR-1 Uploaded: 5/9/2025 (6793 kb)
      • C-DSGN-GRAD Uploaded: 5/9/2025 (7261 kb)
      • C-DSGN-GRAD-EXIS Uploaded: 5/9/2025 (7529 kb)
      • C-DSGN-PIPE-NTWK Uploaded: 5/9/2025 (4494 kb)
      • C-FDOT-GRAD Uploaded: 5/9/2025 (3335 kb)
      • C-FDOT-GRAD Uploaded: 5/9/2025 (3 kb)
      • C-FDOT-GRAD-1 Uploaded: 5/9/2025 (3557 kb)
      • C-GRAD Uploaded: 5/9/2025 (6073 kb)
      • C-GRAD Uploaded: 5/9/2025 (4 kb)
      • C-LAYT Uploaded: 5/9/2025 (4375 kb)
      • C-LAYT Uploaded: 5/9/2025 (3 kb)
      • C-UTIL Uploaded: 5/9/2025 (3357 kb)
      • C-UTIL Uploaded: 5/9/2025 (3 kb)
      • SITE DATA TABLE Uploaded: 5/9/2025 (2 kb)
    • Civil FDOT Bid Set - 05.06.25.pdf Uploaded: 5/20/2025 (3757 kb)
    • Complete Bid Set - 05.09.25.pdf Uploaded: 5/9/2025 (100997 kb)
    • Sign Package - 05.09.25.pdf Uploaded: 5/9/2025 (3064 kb)
    • Survey - 05.09.25.pdf Uploaded: 5/9/2025 (1173 kb)
  • Bid Instructions - 05.09.25.pdf Uploaded: 5/9/2025 (217 kb)
  • Bid Invite - 05.09.25.pdf Uploaded: 5/9/2025 (193 kb)
  • Responsibility Matrix - 05.09.25-1.pdf Uploaded: 5/9/2025 (120 kb)

Project Info

Project #
Project Name Circle K - Zephyrhills
Location Pasco County
Address Map It 38615 Chancey Rd
City Zephyrhills
State FL
Zip 33540
Bid Date May 30, 2025
Bid Time 5:00 PM
 
Scope New construction including site work for a 5,964 SF Circle K gas station located in Zephyrhills, FL. 
Plans
Other Info Please be sure to review the responsibility matrix for owner supplied materials.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
FDOT Plans James Hines 5/20/2025

Mulligan Constructors, Inc. Contacts

Company Contact Title Phone Extension Fax Email
Mulligan Constructors, Inc. James Hines Estimator 407-654-6523 jhines@mulliganconstructors.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.