Scope |
The work involves all construction indicated on the drawings and specifications, included but not
limited to the following: The scope of work will include a free-standing building of approximately
10,900 sq ft for the Warrior Wellness Center at the north side of the Lincoln Lutheran Site.
The work includes offices, classrooms, restrooms, custodial/storage rooms, speed training and
weight training areas. Specific construction includes: Concrete slabs on grade, concrete footings,
wood and metal stud walls, standing seam metal roofing, metal wall panels, gyp board, plywood,
acoustical ceilings, paint, aluminum entrance framing, visual display boards, casework, wood
doors, hollow metal frames, toilet accessories, HVAC split systems, plumbing, power and lighting
systems, as indicated in the construction documents.
|