Scope |
This is our job. Site work and chiller pad construction will begin Mid-September 2025, and the chiller will be delivered Mid-December 2025.
The project is open shop and Prevailing Wage.
It is also tax exempt for certain materials. See the ACT 45 tax exempt form in the spec folder to see if your materials are tax exempt.
RFI's are due by 12 PM on June 20, 2025.
Trane is supplying and delivering the chiller. Chiller material pricing is not to be included in your proposal. All ancillary materials required for a complete chiller installation are to be included.
The HVAC contractor is responsible for receiving the chiller, unloading it, setting it in place, make all the final connections, and testing.
Scope of work includes, but is not limited to:
Alternate for Delegated Design for Helical or Micro Piles Site Demolition Building Concrete CMU Simulated Stone Veneer & Pre-Cast Wall Caps Structural Steel Joint Sealants Exterior Grade Quilted Fiberglass Absorber: Sound Seal QFA-EXT-D-2 or equal Sound Attenuation for Mechanical Equipment by VAW Systems or equal HM DFH Paint HVAC Electrical Sitework Site Concrete Site Sign Relocation Lawn Restoration Gravel Groundcover Site Utilities
By providing this quote, Subcontractor/Supplier acknowledges that, if awarded this project, Subcontractor/Supplier will provide any requested prequalification documentation, sign the subcontract/purchase order with no revisions, adhere to all Safety Policies and Procedures, and provide a Certificate of Insurance, including any and all requirements of JEM Group and the Prime Contract. Please abide by all confidentiality requirements as stated in the bid documents.
Proposals are due on or before July 7th at 12 PM and shall include:
-
Subcontractor Proposal
-
Bid Breakdown should include:
-
Unit Costs
-
Hourly Rates
-
VE Options
-
Alternates
3. Schedule allowances, and lead times
Subcontractors are required to submit all RFI's and Proposals through PreconSuite. This will ensure your bid is received. Your RFI questions, your bid and bid form tab answers can only be viewed/seen by JEM Group.
|