FIG Bld 0-48 Renovation

Project Files

  • Specs
    • DIV 27
      • DIV 27 Uploaded: 6/24/2025 (956 kb)
    • DIV 3
      • 033000-CastInPlaceConcrete Uploaded: 6/24/2025 (940 kb)
    • DIV 1
      • 010100-Summary Uploaded: 6/24/2025 (881 kb)
      • 011200-Coordination Uploaded: 6/24/2025 (858 kb)
      • 013100-SequenceOfConstruction Uploaded: 6/24/2025 (853 kb)
      • 013300-Submittals Uploaded: 6/24/2025 (1349 kb)
      • 014000-QualityControl Uploaded: 6/24/2025 (2138 kb)
      • 016350-DMVASuppProvisions Uploaded: 6/24/2025 (854 kb)
      • 017700-Closeout Uploaded: 6/24/2025 (861 kb)
      • 017823-OandM Uploaded: 6/24/2025 (871 kb)
      • 017839-ProjRecDoc Uploaded: 6/24/2025 (855 kb)
    • DIV 6
      • 061053-MiscRoughCarpentry Uploaded: 6/24/2025 (868 kb)
    • DIV 10
      • 101400-IntSignage Uploaded: 6/24/2025 (855 kb)
      • 102113-ToiletCompartments Uploaded: 6/24/2025 (863 kb)
      • 102800-ToiletAccessories Uploaded: 6/24/2025 (857 kb)
      • 104416-FireExtinguishers Uploaded: 6/24/2025 (850 kb)
    • DIV 7
      • 072100-ThermalInsulation Uploaded: 6/24/2025 (890 kb)
      • 072101-SprayFoamInsulation Uploaded: 6/24/2025 (859 kb)
      • 075423-TPORoofing Uploaded: 6/24/2025 (884 kb)
      • 076200-SheetMetalFlashing Uploaded: 6/24/2025 (876 kb)
      • 079200-JointSealants Uploaded: 6/24/2025 (874 kb)
    • DIV 4
      • 040120-MaintOfBrickUnits Uploaded: 6/24/2025 (896 kb)
    • DIV 0
      • 001-Cover Uploaded: 6/24/2025 (1129 kb)
      • 002-DwgIndex Uploaded: 6/24/2025 (820 kb)
      • 003-TOC Uploaded: 6/24/2025 (935 kb)
      • 004-Notice to Bidders Uploaded: 6/24/2025 (103 kb)
      • 005-Bid docs to be returned with bid submission Uploaded: 6/24/2025 (2871 kb)
      • 006-FTIG Area_Maps_0_7_8_letter Uploaded: 6/24/2025 (302 kb)
      • 007-Instructions to Bid Uploaded: 6/24/2025 (443 kb)
      • 008-General Conditions Uploaded: 6/24/2025 (999 kb)
      • 009-Admin Procedures Uploaded: 6/24/2025 (596 kb)
      • 010-Prevailing Wage Rates Uploaded: 6/24/2025 (276 kb)
    • DIV 5
      • 054000-ColdFormedMetalFraming Uploaded: 6/24/2025 (880 kb)
    • DIV 22
      • DIV 22 Uploaded: 6/24/2025 (980 kb)
    • DIV 23
      • DIV 23 Uploaded: 6/24/2025 (1288 kb)
    • DIV 12
      • 123530-Casework Uploaded: 6/24/2025 (903 kb)
    • DIV 8
      • 081113-HMDoors Uploaded: 6/24/2025 (884 kb)
      • 084113-AlumFramedEntrances Uploaded: 6/24/2025 (877 kb)
      • 085113-AlumWindows Uploaded: 6/24/2025 (879 kb)
      • 087111-DoorHdw Uploaded: 6/24/2025 (912 kb)
      • 088000-Glazing Uploaded: 6/24/2025 (897 kb)
    • DIV 2
      • 024116-Demo Uploaded: 6/24/2025 (867 kb)
      • 024120-CuttingAndPatch Uploaded: 6/24/2025 (858 kb)
    • DIV 9
      • 092216-NonStructMetalFraming Uploaded: 6/24/2025 (861 kb)
      • 092900-GypBoard Uploaded: 6/24/2025 (865 kb)
      • 093013-CeramicTiling Uploaded: 6/24/2025 (873 kb)
      • 095123-ACT Uploaded: 6/24/2025 (872 kb)
      • 096513-ResilientBase Uploaded: 6/24/2025 (864 kb)
      • 096519-ResilientTileFlooring Uploaded: 6/24/2025 (865 kb)
      • 096813-TileCarpeting Uploaded: 6/24/2025 (866 kb)
      • 096816-SheetCarpet Uploaded: 6/24/2025 (863 kb)
      • 096900-AccessFlooring Uploaded: 6/24/2025 (877 kb)
      • 099113-ExtPainting Uploaded: 6/24/2025 (872 kb)
      • 099123-IntPainting Uploaded: 6/24/2025 (866 kb)
      • 099600-EpoxyCoating Uploaded: 6/24/2025 (864 kb)
      • 099726-CementitiousCoating Uploaded: 6/24/2025 (860 kb)
    • DIV 26
      • DIV 26 Uploaded: 6/24/2025 (1085 kb)
  • Plans
    • 02 Civil
      • 003-C1.0-Site Uploaded: 6/24/2025 (1327 kb)
    • 03 Architectural
      • 004-A1.0-Demo Uploaded: 6/24/2025 (685 kb)
      • 005-A1.1-RCPDemo Uploaded: 6/24/2025 (519 kb)
      • 006-A1.2-FlAndRoof Uploaded: 6/24/2025 (648 kb)
      • 007-A1.3-RCP Uploaded: 6/24/2025 (432 kb)
      • 008-A2.0-Demo Uploaded: 6/24/2025 (2057 kb)
      • 009-A2.1-SecDtls Uploaded: 6/24/2025 (522 kb)
      • 010-A3.0-Elev Uploaded: 6/24/2025 (511 kb)
      • 011-A3.1-Elev Uploaded: 6/24/2025 (385 kb)
      • 012-A4.0-Dtls Uploaded: 6/24/2025 (467 kb)
      • 013-A5.0-DoorSchedule Uploaded: 6/24/2025 (517 kb)
      • 014-A5.1-WindowSchedule Uploaded: 6/24/2025 (554 kb)
      • 015-A6.0-FinishSchedule Uploaded: 6/24/2025 (495 kb)
      • 016-A7.0-RoofingDtls Uploaded: 6/24/2025 (7091 kb)
    • 01 General
      • 001-G1.0-Cover Uploaded: 6/24/2025 (462 kb)
      • 002-G1.1-ProjInfo Uploaded: 6/24/2025 (502 kb)
    • 04 Mechanical
      • 017-M0.1-Demo Uploaded: 6/24/2025 (182 kb)
      • 018-M1.1-Secs Uploaded: 6/24/2025 (577 kb)
      • 019-M2.1-Schedules Uploaded: 6/24/2025 (473 kb)
      • 020-M2.2-Schedules Uploaded: 6/24/2025 (497 kb)
      • 021-M2.3-Notes Uploaded: 6/24/2025 (1237 kb)
    • 05 Plumbing
      • 022-P1.1-Dtls Uploaded: 6/24/2025 (1276 kb)
      • 023-P1.2-Piping Uploaded: 6/24/2025 (389 kb)
    • 06 Electrical
      • 024-E0.1-Demo Uploaded: 6/24/2025 (318 kb)
      • 025-E1.1-Lighting Uploaded: 6/24/2025 (238 kb)
      • 026-E2.1-Power Uploaded: 6/24/2025 (160 kb)
      • 027-E2.2-Power Uploaded: 6/24/2025 (171 kb)
      • 028-E3.1-Data Uploaded: 6/24/2025 (176 kb)
      • 029-E4.1-Schedules Uploaded: 6/24/2025 (265 kb)
      • 030-E4.2-Schedules Uploaded: 6/24/2025 (300 kb)

Project Info

Project #
Project Name FIG Bld 0-48 Renovation
Location Building 0-48 Fort Indiantown Gap Annville, PA 17003
Address Map It Building 0-48 Fort Indiantown Gap
City Annville
State PA
Zip 17003
Bid Date July 17, 2025
Bid Time 2:00 PM
 
Scope
eciConstruction is seeking bids from subcontractors and suppliers for the general construction contract work for the Building 0-48 Fort Indiantown Gap project in Annville, PA. The project consists of selective demolition of the existing building and renovations of the USPFO facility. For a full scope of work please see the complete project documents. 
 

Additional Bid Info:

  • Our bids are due to the owner on July 17th, at 2:00PM.  Please have your bids to us no later than end of the day on July 16th. 
  • RFIs need to be received 7 days prior to bid date if you want them to be addressed. 
  • This project will begin approximately October of 2025 with a project duration of 120 days.
  • This project is bidding as a multi-prime project. Plumbing, HVAC, and Electrical contractors are required to bid directly to the owner.
  • Prevailing wages do apply. Please bid accordingly.
  • No substitutions requests will be considered during the bid period. Bids shall be based on products from one of the manufactures listed in the specification only.
  • The project owner or eciConstruction will not pay any materials increases after a bid is submitted. Please include any required materials increases in your bid. 
Plans The project documents are available for veiwing and/or downloading in the Pipeline Planroom.
Other Info Contact

Justin Peachy  717-638-3318
jlp@eciconstruction.com

Estimators

Company Estimator Phone Extension Fax Email
eciConstruction, LLC Justin Peachey 717-638-3318 jlp@eciconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.