Gettysburg SD Team Room Improvements

Project Files

  • Addendum 1
    • SpecsOnly-ADD1
      • 087100-DoorHdw-ADD1 Uploaded: 8/7/2025 (109 kb)
      • NonCollusionAffidavit-ADD1 Uploaded: 8/7/2025 (109 kb)
      • eVerify-ADD1 Uploaded: 8/7/2025 (52 kb)
    • Addendum 1 Uploaded: 8/7/2025 (932 kb)
  • Specs
    • DIV 08
      • 081113-HMDoorsAndFrames Uploaded: 8/5/2025 (106 kb)
      • 088000-Glazing Uploaded: 8/5/2025 (118 kb)
    • DIV 23
      • DIV 23 Uploaded: 8/5/2025 (1193 kb)
    • DIV 07
      • 071300-SheetWaterproofing Uploaded: 8/5/2025 (80 kb)
      • 072100-ThermalInsulation Uploaded: 8/5/2025 (77 kb)
      • 072129-SprayedInsulation Uploaded: 8/5/2025 (72 kb)
      • 075300-ElastomericMembraneRoofing Uploaded: 8/5/2025 (99 kb)
      • 079200-JointSealants Uploaded: 8/5/2025 (95 kb)
    • DIV 22
      • DIV 22 Uploaded: 8/5/2025 (1244 kb)
    • DIV 02
      • 024119-SelectiveDemo Uploaded: 8/5/2025 (21 kb)
    • DIV 06
      • 061000-RoughCarpentry Uploaded: 8/5/2025 (78 kb)
    • DIV 05
      • 051200-StructSteelFraming Uploaded: 8/5/2025 (82 kb)
      • 053100-SteelDecking Uploaded: 8/5/2025 (86 kb)
      • 055000-MiscMetals Uploaded: 8/5/2025 (105 kb)
    • DIV 12
      • 123216-ManufPlamCasework Uploaded: 8/5/2025 (104 kb)
      • 123600-Countertops Uploaded: 8/5/2025 (81 kb)
    • DIV 0
      • 001-Cover Uploaded: 8/5/2025 (222 kb)
      • 002-TOC Uploaded: 8/5/2025 (116 kb)
      • 003-ProjTitlePg Uploaded: 8/5/2025 (91 kb)
      • 004-SealsPg Uploaded: 8/5/2025 (257 kb)
      • 005-ListOfDwgs Uploaded: 8/5/2025 (102 kb)
      • 006-AdForBids Uploaded: 8/5/2025 (207 kb)
      • 007-InstructToBid Uploaded: 8/5/2025 (72 kb)
      • 008-SuppInstructToBid Uploaded: 8/5/2025 (118 kb)
      • 009-PreBidMeeting Uploaded: 8/5/2025 (97 kb)
      • 010-Substitution Uploaded: 8/5/2025 (102 kb)
      • 011-SubstitutionForm Uploaded: 8/5/2025 (106 kb)
      • 012-ExistingCondInfo Uploaded: 8/5/2025 (74 kb)
      • 013-GeoTech Uploaded: 8/5/2025 (75 kb)
      • 014-PermitApp Uploaded: 8/5/2025 (71 kb)
      • 015-BidCover Uploaded: 8/5/2025 (66 kb)
      • 016-BidForm Uploaded: 8/5/2025 (148 kb)
      • 017-SOV Uploaded: 8/5/2025 (74 kb)
      • 018-Checklist Uploaded: 8/5/2025 (125 kb)
      • 019-ProjForms Uploaded: 8/5/2025 (96 kb)
      • 020-SubstitutionFormConstPh Uploaded: 8/5/2025 (141 kb)
      • 021-SuppCond Uploaded: 8/5/2025 (124 kb)
      • 022-PrevailingWages Uploaded: 8/5/2025 (106 kb)
    • DIV 31
      • 311000-SiteClearning Uploaded: 8/5/2025 (21 kb)
      • 312000-EarthMoving Uploaded: 8/5/2025 (67 kb)
    • DIV 03
      • 033000-CastInPlaceConcrete Uploaded: 8/5/2025 (144 kb)
      • 036000-Grout Uploaded: 8/5/2025 (82 kb)
    • DIV 28
      • DIV 28 Uploaded: 8/5/2025 (93 kb)
    • DIV 09
      • 095100-AcousticalCeilings Uploaded: 8/5/2025 (81 kb)
      • 096723-ResinousFlooring Uploaded: 8/5/2025 (94 kb)
      • 099000-Painting Uploaded: 8/5/2025 (90 kb)
    • DIV 26
      • DIV 26 Uploaded: 8/5/2025 (1478 kb)
    • DIV 04
      • 042000-UnitMasonry Uploaded: 8/5/2025 (117 kb)
    • DIV 11
      • 117500-SportsTreatmentEquip Uploaded: 8/5/2025 (82 kb)
    • DIV 33
      • 334200-StormwaterConveyance Uploaded: 8/5/2025 (29 kb)
    • DIV 10
      • 101100-VisualDisplayUnits Uploaded: 8/5/2025 (72 kb)
      • 101400-Signage Uploaded: 8/5/2025 (74 kb)
      • 101419-DimensionLtrSignage Uploaded: 8/5/2025 (80 kb)
      • 102113.19-PlasticToiletCompartments Uploaded: 8/5/2025 (74 kb)
      • 102800-ToiletAccessories Uploaded: 8/5/2025 (83 kb)
    • DIV 01
      • 011000-Summary Uploaded: 8/5/2025 (112 kb)
      • 011200-MultiSummary Uploaded: 8/5/2025 (115 kb)
      • 012300-Alternates Uploaded: 8/5/2025 (96 kb)
      • 012500-SubstitutionProcedure Uploaded: 8/5/2025 (87 kb)
      • 012600-ContractModProcedure Uploaded: 8/5/2025 (81 kb)
      • 012900-Payment Uploaded: 8/5/2025 (95 kb)
      • 013100-PMandCoordination Uploaded: 8/5/2025 (122 kb)
      • 013200-ConstProgressDoc Uploaded: 8/5/2025 (118 kb)
      • 013300-Submittals Uploaded: 8/5/2025 (128 kb)
      • 014000-QualityReq Uploaded: 8/5/2025 (134 kb)
      • 014200-References Uploaded: 8/5/2025 (132 kb)
      • 015000-TempFacilities Uploaded: 8/5/2025 (129 kb)
      • 016000-ProductReq Uploaded: 8/5/2025 (118 kb)
      • 017300-Execution Uploaded: 8/5/2025 (124 kb)
      • 017419-ConstWasteMgmt Uploaded: 8/5/2025 (86 kb)
      • 017700-Closeout Uploaded: 8/5/2025 (115 kb)
      • 017823-OandM Uploaded: 8/5/2025 (103 kb)
      • 017839-ProjRecDocs Uploaded: 8/5/2025 (86 kb)
      • 017900-Demonstration Uploaded: 8/5/2025 (107 kb)
    • DIV 32
      • 321216-AsphaltPaving Uploaded: 8/5/2025 (40 kb)
      • 322800-MiscSiteImprovements Uploaded: 8/5/2025 (57 kb)
      • 323113-ChainlinkFences Uploaded: 8/5/2025 (38 kb)
      • 323223-SegmentalRetainingWalls Uploaded: 8/5/2025 (33 kb)
      • 329113-SoilPrep Uploaded: 8/5/2025 (38 kb)
      • 329200-TurfAndGrasses Uploaded: 8/5/2025 (87 kb)
    • GeoTechReport Uploaded: 8/5/2025 (1615 kb)
  • Plans
    • 07 Electrical
      • 037-E001-Legend Uploaded: 8/5/2025 (128 kb)
      • 038-E002-GenInfo Uploaded: 8/5/2025 (112 kb)
      • 039-E003-Site Uploaded: 8/5/2025 (145 kb)
      • 040-E101-Ligting Uploaded: 8/5/2025 (206 kb)
      • 041-E111-Power Uploaded: 8/5/2025 (544 kb)
      • 042-E121-Systems Uploaded: 8/5/2025 (189 kb)
      • 043-E501-Dtls Uploaded: 8/5/2025 (103 kb)
      • 044-E601-Schedules Uploaded: 8/5/2025 (126 kb)
      • Thumbs-2 Uploaded: 8/5/2025 (14 kb)
    • 06 Mechanical
      • 030-M001-GenInfo Uploaded: 8/5/2025 (113 kb)
      • 031-M101-Ductwork Uploaded: 8/5/2025 (174 kb)
      • 032-M161-Piping Uploaded: 8/5/2025 (719 kb)
      • 033-M501-Dtls Uploaded: 8/5/2025 (143 kb)
      • 034-M531-Controls Uploaded: 8/5/2025 (81 kb)
      • 035-M601-Schedules Uploaded: 8/5/2025 (92 kb)
      • 036-M761-RiserDiagrams Uploaded: 8/5/2025 (103 kb)
    • 02 General
      • 009-G001-Cover Uploaded: 8/5/2025 (235 kb)
      • 010-G101-Code Uploaded: 8/5/2025 (355 kb)
      • Thumbs-1 Uploaded: 8/5/2025 (15 kb)
    • 01 Land Development
      • 001-Cover-1 Uploaded: 8/5/2025 (703 kb)
      • 002-1of7-Cover Uploaded: 8/5/2025 (5171 kb)
      • 003-2of7-ExistingCond Uploaded: 8/5/2025 (591 kb)
      • 004-3of7-Demo Uploaded: 8/5/2025 (496 kb)
      • 005-4of7-Site Uploaded: 8/5/2025 (303 kb)
      • 006-5of7-Grading Uploaded: 8/5/2025 (573 kb)
      • 007-6of7-SiteAndUtilityDtl Uploaded: 8/5/2025 (396 kb)
      • 008-7of7-EandS Uploaded: 8/5/2025 (812 kb)
      • Thumbs Uploaded: 8/5/2025 (17 kb)
    • 05 Plumbing
      • 024-P001-GenInfo Uploaded: 8/5/2025 (100 kb)
      • 025-P101-Water Uploaded: 8/5/2025 (164 kb)
      • 026-P102-Sanitary Uploaded: 8/5/2025 (168 kb)
      • 027-P501-Dtls Uploaded: 8/5/2025 (117 kb)
      • 028-P601-Schedules Uploaded: 8/5/2025 (86 kb)
      • 029-P701-RiserDiagrams Uploaded: 8/5/2025 (638 kb)
    • 04 Architectural
      • 017-A101-Floor Uploaded: 8/5/2025 (219 kb)
      • 018-A102-RCP Uploaded: 8/5/2025 (366 kb)
      • 019-A103-Roof Uploaded: 8/5/2025 (664 kb)
      • 020-A201-Elevations Uploaded: 8/5/2025 (206 kb)
      • 021-A301-BldSecs Uploaded: 8/5/2025 (240 kb)
      • 022-A302-WallSecs Uploaded: 8/5/2025 (263 kb)
      • 023-A601-Schedules Uploaded: 8/5/2025 (157 kb)
    • 03 Structural
      • 011-S001-GenNotes Uploaded: 8/5/2025 (84 kb)
      • 012-S002-Dtls Uploaded: 8/5/2025 (247 kb)
      • 013-S100-Foundation Uploaded: 8/5/2025 (192 kb)
      • 014-S101-RoofFraming Uploaded: 8/5/2025 (76 kb)
      • 015-S301-Sections Uploaded: 8/5/2025 (227 kb)
      • 016-S302-MiscBleacher Uploaded: 8/5/2025 (139 kb)

Project Info

Project #
Project Name Gettysburg SD Team Room Improvements
Location 37 Lefever Street Gettysburg PA 17325
Address Map It 37 Lefever Street
City Gettysburg
State PA
Zip 17325
Bid Date August 26, 2025
Bid Time 1:00 PM
 
Scope
eciConstruction is seeking sub contractors and suppliers for the renovation and improvements to the Gettysburg Area School District Team Room. The work generally involves the construction of a new team-room building consisting of two locker rooms and a training room totaling approximately 3,150 square feet.  Site work to include excavation, utility relocation / installation, wall construction and paving and other work indicated in the Contract Documents. 


  • Bids are due on August 26th at 1 pm.  Please submit bids to eciConstruction no later than end of day on August 25th.
  • Anticipated start of project is November of 2025.
  • Project duration is 210 days.
  • Multi prime - GC, MC, PC, EC
  • Prevailing wages apply
  • Substitutions are to be approved prior to bid and submitted 10 days prior to bid date. If you wish to bid with products not listed in the specs, you must fill out and submit the substitution form bound in Project Manual, Section 002601.
  • (4) Alternates: See section 012300, please provide pricing for all that apply to your scope. 
  • RFI's must be submitted 7 days prior to bid date.
Plans Project documents can be found in the Pipeline planroom for this project.
Other Info
Project contact:

Justin Peachey

717-638-3318
jlp@eciconstruction.com 

*If you plan to bid, please click the green "YES" box below to insure we send you all future correspondence. If you are not bidding and no longer wish to receive correspondence on this project, please click the red "NO" box below and you will no longer receive emails regarding this project. If you wish to be removed permanently from our bid list on all future projects, please email your request to estimating@eciconstruction.com. 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum 1 - Gettysburg SD Team Room Improvements Nick Yinger 8/7/2025

eciConstruction, LLC Contacts

Company Contact Title Phone Extension Fax Email
eciConstruction, LLC Justin Peachey Estimator 717-638-3318 jlp@eciconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.