ALCOM Redundant Power B9480

Project Files

  • Amendment 0003 9-10-25
    • FXSB 24-1401 Repair ALCOM Redundant Power B9480 Amendment 3.pdf Uploaded: 9/10/2025 (247 kb)
  • Amendment 0004 9-16-25
    • 11. FXSB 24-1401 Repair ALCOM Redundant Power B9480 Q-A 16SEP.pdf Uploaded: 9/16/2025 (467 kb)
    • 4. FXSB 24-1401 SOW and Specs_Rev02 15 Sept 25.pdf Uploaded: 9/16/2025 (1036 kb)
    • FXSB 24-1401 Repair ALCOM Redundant Power B9480 Amendment 4.pdf Uploaded: 9/16/2025 (255 kb)
  • Amendment 0001 9-3-25
    • FXSB 24-1401 Repair ALCOM Redundant Power B9480 Amendment 1.pdf Uploaded: 9/3/2025 (293 kb)
  • Amendment 0002 9-10-25
    • Photos
      • 12.47kV Feeder-1.jpg Uploaded: 9/10/2025 (101 kb)
      • 12.47kV Feeder.jpg Uploaded: 9/10/2025 (101 kb)
      • 12.47kV Feeder1.jpg Uploaded: 9/10/2025 (100 kb)
      • 12.47kV Feeder2.jpg Uploaded: 9/10/2025 (102 kb)
      • 12.47kV Feeder3.jpg Uploaded: 9/10/2025 (97 kb)
      • 12.47kV Feeder4.jpg Uploaded: 9/10/2025 (76 kb)
      • 12.47kV Feeder42.jpg Uploaded: 9/10/2025 (76 kb)
      • Feeder 24-1.jpg Uploaded: 9/10/2025 (83 kb)
      • Feeder 24-2.jpg Uploaded: 9/10/2025 (61 kb)
      • Feeder 24-3.jpg Uploaded: 9/10/2025 (50 kb)
      • Feeder 24-4.jpg Uploaded: 9/10/2025 (61 kb)
      • Feeder 24-5.jpg Uploaded: 9/10/2025 (87 kb)
      • Feeder 24.jpg Uploaded: 9/10/2025 (87 kb)
      • PB-2 Feeders to Genset.jpg Uploaded: 9/10/2025 (98 kb)
      • PB-2-2.jpg Uploaded: 9/10/2025 (94 kb)
      • PB-2-3.jpg Uploaded: 9/10/2025 (79 kb)
      • PB-2-4.jpg Uploaded: 9/10/2025 (86 kb)
      • PB-2.jpg Uploaded: 9/10/2025 (101 kb)
      • PB-21.jpg Uploaded: 9/10/2025 (97 kb)
    • 11. FXSB 24-1401 Repair ALCOM Redundant Power B9480 Questions and Answers Sept 9.pdf Uploaded: 9/10/2025 (317 kb)
    • 12. FXSB 16-1401 RAOC Generator Replacement as-built drawings - Complete.pdf Uploaded: 9/10/2025 (15089 kb)
    • 13. UST.pdf Uploaded: 9/10/2025 (234 kb)
    • 14. SEQUENCE OF OPS_GENERATOR_SWITCHGEAR_EPS_RAOC.pdf Uploaded: 9/10/2025 (15532 kb)
    • 15. TRANSFER OPS_ALCOM_OEM.pdf Uploaded: 9/10/2025 (1313 kb)
    • 16. Existing utilities along Mundy Ave.pdf Uploaded: 9/10/2025 (264 kb)
    • 17. Existing Comm infrastructure at Mundy Ave.pdf Uploaded: 9/10/2025 (953 kb)
    • 2. FXSB 24-1401 Price Schedule Rev. 01.pdf Uploaded: 9/10/2025 (182 kb)
    • 4. FXSB 24-1401 SOW and Specs_Rev01 9 Sept 25.pdf Uploaded: 9/10/2025 (944 kb)
    • FXSB 24-1401 Repair ALCOM Redundant Power B9480 Amendment 2.pdf Uploaded: 9/10/2025 (235 kb)
  • RFIs
    • RFIs - Ahtna - FXSB 24-1401 Alcom Redundant Power B9480.xlsx Uploaded: 8/13/2025 (35 kb)
  • Photos
    • IMG_0606.JPG Uploaded: 8/18/2025 (10162 kb)
    • IMG_0607.JPG Uploaded: 8/18/2025 (8011 kb)
    • IMG_0608.JPG Uploaded: 8/18/2025 (8698 kb)
    • IMG_0609.JPG Uploaded: 8/18/2025 (7999 kb)
    • IMG_0610.JPG Uploaded: 8/18/2025 (5342 kb)
    • IMG_0611.JPG Uploaded: 8/18/2025 (5993 kb)
    • IMG_0612.JPG Uploaded: 8/19/2025 (6425 kb)
    • IMG_0613.JPG Uploaded: 8/18/2025 (8425 kb)
    • IMG_0614.JPG Uploaded: 8/18/2025 (7516 kb)
    • IMG_0615.JPG Uploaded: 8/18/2025 (5310 kb)
    • IMG_0616.JPG Uploaded: 8/18/2025 (5862 kb)
    • IMG_0617.JPG Uploaded: 8/18/2025 (9583 kb)
    • IMG_0618.JPG Uploaded: 8/18/2025 (7094 kb)
    • IMG_0619.JPG Uploaded: 8/18/2025 (5711 kb)
    • IMG_0620.JPG Uploaded: 8/18/2025 (5157 kb)
    • IMG_0621.JPG Uploaded: 8/18/2025 (6731 kb)
    • IMG_0622.JPG Uploaded: 8/18/2025 (5501 kb)
    • IMG_0623.JPG Uploaded: 8/18/2025 (5256 kb)
    • IMG_0624.JPG Uploaded: 8/18/2025 (5199 kb)
    • IMG_0625.JPG Uploaded: 8/18/2025 (6054 kb)
    • IMG_0626.JPG Uploaded: 8/18/2025 (5401 kb)
    • IMG_0627.JPG Uploaded: 8/18/2025 (5322 kb)
    • IMG_0628.JPG Uploaded: 8/18/2025 (6350 kb)
    • IMG_0629.JPG Uploaded: 8/18/2025 (5991 kb)
    • IMG_0630.JPG Uploaded: 8/18/2025 (8088 kb)
    • IMG_0631.JPG Uploaded: 8/18/2025 (7881 kb)
    • IMG_0632.JPG Uploaded: 8/18/2025 (7704 kb)
    • IMG_0633.JPG Uploaded: 8/18/2025 (7683 kb)
    • IMG_0634.JPG Uploaded: 8/18/2025 (5543 kb)
    • IMG_0635.JPG Uploaded: 8/18/2025 (6018 kb)
    • IMG_0636.JPG Uploaded: 8/18/2025 (5710 kb)
    • IMG_0637.JPG Uploaded: 8/18/2025 (5577 kb)
    • IMG_0638.JPG Uploaded: 8/18/2025 (5184 kb)
    • IMG_0639.JPG Uploaded: 8/18/2025 (6737 kb)
    • IMG_0640.JPG Uploaded: 8/18/2025 (5228 kb)
    • IMG_0641.JPG Uploaded: 8/18/2025 (5321 kb)
    • IMG_0642.JPG Uploaded: 8/18/2025 (3437 kb)
    • IMG_0643.JPG Uploaded: 8/18/2025 (5246 kb)
    • IMG_0644.JPG Uploaded: 8/18/2025 (5496 kb)
    • IMG_0645.JPG Uploaded: 8/18/2025 (4885 kb)
    • IMG_0646.JPG Uploaded: 8/18/2025 (9480 kb)
    • IMG_0647.JPG Uploaded: 8/18/2025 (8924 kb)
    • IMG_0648.JPG Uploaded: 8/18/2025 (7829 kb)
    • IMG_0649.JPG Uploaded: 8/18/2025 (8111 kb)
    • IMG_0650.JPG Uploaded: 8/18/2025 (8724 kb)
    • IMG_0651.JPG Uploaded: 8/18/2025 (9091 kb)
    • IMG_0652.JPG Uploaded: 8/19/2025 (5675 kb)
    • IMG_8521.JPG Uploaded: 8/19/2025 (4833 kb)
    • IMG_8522.JPG Uploaded: 8/19/2025 (5488 kb)
    • IMG_8523.JPG Uploaded: 8/19/2025 (6940 kb)
    • IMG_8524.JPG Uploaded: 8/19/2025 (4341 kb)
    • IMG_8525.JPG Uploaded: 8/19/2025 (6916 kb)
    • IMG_8526.JPG Uploaded: 8/19/2025 (7356 kb)
    • IMG_8527.JPG Uploaded: 8/19/2025 (7043 kb)
    • IMG_8528.JPG Uploaded: 8/19/2025 (4763 kb)
    • IMG_8529.JPG Uploaded: 8/19/2025 (5493 kb)
    • IMG_8530.JPG Uploaded: 8/19/2025 (4114 kb)
    • IMG_8531.JPG Uploaded: 8/19/2025 (6750 kb)
    • IMG_8532.JPG Uploaded: 8/19/2025 (5159 kb)
    • IMG_8533.JPG Uploaded: 8/19/2025 (4504 kb)
    • IMG_8536.JPG Uploaded: 8/19/2025 (4769 kb)
    • IMG_8537.JPG Uploaded: 8/19/2025 (4380 kb)
    • IMG_8538.JPG Uploaded: 8/19/2025 (4651 kb)
    • IMG_8539.JPG Uploaded: 8/19/2025 (5186 kb)
    • IMG_8540.JPG Uploaded: 8/19/2025 (5009 kb)
    • IMG_8541.JPG Uploaded: 8/19/2025 (4516 kb)
    • IMG_8542.JPG Uploaded: 8/19/2025 (4751 kb)
    • IMG_8543.JPG Uploaded: 8/19/2025 (4508 kb)
    • IMG_8546.JPG Uploaded: 8/19/2025 (4492 kb)
    • IMG_8547.JPG Uploaded: 8/19/2025 (4257 kb)
    • IMG_8548.JPG Uploaded: 8/19/2025 (4568 kb)
    • IMG_8549.JPG Uploaded: 8/19/2025 (4260 kb)
    • IMG_8550.JPG Uploaded: 8/19/2025 (4197 kb)
    • IMG_8551.JPG Uploaded: 8/19/2025 (4446 kb)
    • IMG_8552.JPG Uploaded: 8/19/2025 (4324 kb)
    • IMG_8553.JPG Uploaded: 8/19/2025 (4746 kb)
    • IMG_8554.JPG Uploaded: 8/19/2025 (4278 kb)
    • IMG_8555.JPG Uploaded: 8/19/2025 (4141 kb)
    • IMG_8556.mp4 Uploaded: 8/19/2025 (55375 kb)
    • IMG_8557.JPG Uploaded: 8/19/2025 (7535 kb)
    • IMG_8558.JPG Uploaded: 8/19/2025 (7738 kb)
  • 10. JBER CAD GIS RECORD DRAWING AS BUILT STANDARD 2024_FINAL.pdf Uploaded: 8/13/2025 (138 kb)
  • 2. FXSB 24-1401 Price Schedule Template.pdf Uploaded: 8/13/2025 (87 kb)
  • 3. FXSB 24-1401 AF 66.xlsx Uploaded: 8/13/2025 (30 kb)
  • 4. FXSB 24-1401 SOW and Specifications.pdf Uploaded: 8/13/2025 (797 kb)
  • 5. FXSB 24-1401 Drawings with redlines.pdf Uploaded: 8/13/2025 (19387 kb)
  • 6. Class JA ALC Signed_Redacted.pdf Uploaded: 8/13/2025 (641 kb)
  • 7. Justification and Approval Generators 17 Dec 21 1_Redacted.pdf Uploaded: 8/13/2025 (2660 kb)
  • 8. JBER ALCOM_Pre-Final 35pct_Design Narrative.pdf Uploaded: 8/13/2025 (9251 kb)
  • 9. JBER_Telecom Criteria Requirements 28FEB2025.pdf Uploaded: 8/13/2025 (487 kb)
  • Existing Conditions Drawings from 8. JBER ALCOM_Pre-Final 35pct_Design Narrative.pdf Uploaded: 8/13/2025 (1565 kb)
  • Wage Determination AK20250001 07112025.pdf Uploaded: 8/13/2025 (51 kb)

Project Info

Project # FXSB 24-1401
Project Name ALCOM Redundant Power B9480
Location JBER
Address
City Anchorage
State AK
Zip 99503
Bid Date September 22, 2025
Bid Time 2:00 PM
 
Scope BIDS DUE:
  • PLEASE EMAIL QUOTES TO THE FOLLOWING BY 9/18/2025 at 2:00 PM AKDT.
             Proposal is due to JBER 9/22/25 at 2PM

EMAIL QUOTES TO:

MISC PROJECT & RFP INFO:
  • ROM:  $5,000,000 and $10,000,000
  • POP:  730 calendar days after the issuance of the Notice to Proceed (NTP)
  • Bid Hold:  Proposals shall remain valid for 90 days
  • Liquidated Damages (LDs):  Yes. MACC clause 52.211-12 Liquidated Damages (LDs) applies to this task order. LDs are established at $722.08 per day for the first and last day of inexcusable delay, and $467.92 for each interim day. The stated LDs are considered fair and reasonable only as an estimate of probable damages. 
  • Q&A:  RFI's due by 8/19/2025 at 2:00 PM AKDT. Please submit your RFI's to us by 8/18 at 2:00PM AKDT.
  • Site Visit:  First pre-poposal site visit on 8/12/2025 at 9:00 AM AKDT at Building 9480 (Past). 

PROJECT INFO: 
  • 1.1 PROJECT LOCATION:  Project FXSB 24-1401 shall be completed as a routine requirement at or near building 9480, on Joint Base Elmendorf‐Richardson, AK.  Project hours are standard work hours.
  • 1.2 UNIQUE REQUIREMENT: 
    • The Design Narrative calls out two different options for the final location of the generators and supporting equipment. This project has selected the “option 2” location in the Design Narrative, or the grass area across Mundy Ave located NW of B9480. 
    • The Design Narrative and the Design Drawings were based on “option 1”, which assumed the removal of the existing RSS building. The RSS building is to remain and to be protected-in-place. Therefore, any work associated with the removal of the RSS building and its foundation/utilities as called out in the Design Narrative or the Design Drawings shall not be completed with this project. 
    • There is an active communication line that parallels Mundy Ave located within the grass area where the generators/supporting equipment are to be located. Existing communication line shall be protected in-place and shall remain active during construction.
  • 1.3 PROJECT DESCRIPTION:  This project will design and construct a new secondary power system for B9480. Work includes the designing and construction of 2 new generators with enclosure, switchgear with enclosure, 5,000 gallon above-ground fuel tank, and trenching to connect the secondary power system to the building. All new generators, switchgear, and above-ground fuel tank will be supported by reinforced concrete pads. Project also includes the removal of the existing generators (and supporting equipment) and the removal of a 10,000 gallon underground diesel storage tank. 
Plans

BID DOCUMENT LOCATION & BID NOTIFICATION PROCEDURE:

To download the Bid Documents click on the “Undecided” button.  After document review please refer back to this original Bid Invitation email and click on the Bid “Yes” or “No” buttons.

Please see the PLANROOM for:

RFP, SOW, DWGS & EXHIBITS

Other Info Take note in the SOW 2. Design 2.2 & 2.3, it states the design narrative has the wrong location noted, from where the RFP is calling for the generators and enclosure to be located. The FXSB 24-1401 Drawings with Redlines attachment shows the Option 2 location where JBER wants the Generators, Switchgear enclosure and the 5000 Gallon Fuel Tank. 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Site Photos Jeramie Ford 8/18/2025
Notice 001 - Amendment 0001 Jeramie Ford 9/3/2025
Notice 002 - Amendment 0002 Jeramie Ford 9/10/2025
Notice 003 - Amendment 0003 Jeramie Ford 9/10/2025

Ahtna Diversified Holdings, LLC Contacts

Company Contact Title Phone Extension Fax Email
Ahtna Global, LLC Anthony Chen Sr. Program Manager 907-230-9858 achen@ahtna.net
Ahtna Infrastructure & Technologies, LLC Brad Bigelow Sr. Construction Manager 907-529-6319 brad.bigelow@ahtna.net
Ahtna Global, LLC Brandon Carlson Vertical Division Manager 907-227-8068 bcarlson1@DEACTahtna.net
Ahtna Infrastructure & Technologies, LLC Jeramie Ford Chief Estimator 907-229-1125 jeramie.ford@ahtna.net

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.