SR-70 Binney Junction - 03-0H1604

Project Files

  • Z-Bidder Inquiries
    • Bid Inquiry Log 10.30.25.pdf Uploaded: 10/30/2025 (666 kb)
  • _A.Original Project Information 08.29.2025
    • 02-Specs[Preminary 08.29.25]
      • Levee_Special Provisions
        • Levee_Specs_March 2025.pdf Uploaded: 8/29/2025 (1538 kb)
      • Structures_Special Provisions
        • 03-0H160 SSPs 2025 07 17.docx Uploaded: 8/29/2025 (279 kb)
        • 03-0H160 SSPs 2025 07 18.pdf Uploaded: 8/29/2025 (613 kb)
        • Caltrans Standard Specifications - 2024 Edition Uploaded: 8/29/2025 (15724 kb)
      • Track_Special Provisions
        • 03-0H1601-Specs_for_100__RR Track_Submittal_042925.pdf Uploaded: 8/29/2025 (346 kb)
        • 03-0H6104_Information Handout.pdf Uploaded: 8/29/2025 (51365 kb)
        • 2024-10-28 UPRR Special Conditions.pdf Uploaded: 8/29/2025 (88 kb)
        • Non-Expansive Engineered Fill.pdf Uploaded: 8/29/2025 (620 kb)
    • B-Construction Schedule
      • SR 70 CMGC_DRAFT Construction Scheudle_ATP-007 08-11-25.PM.pdf Uploaded: 9/3/2025 (1145 kb)
    • A-Bid Item List
      • 03-0H160_Preliminary Bid Item List.xlsx Uploaded: 8/29/2025 (280 kb)
    • 01-Plans[Preliminary 08.29.25]
      • Electrical_Plans
        • Electrical Plan Set 04-25-2025.pdf Uploaded: 8/29/2025 (12294 kb)
      • As-Build Plans
        • Bridge 16-0018_Marysville UP.pdf Uploaded: 9/23/2025 (1250 kb)
        • Bridge 16-0026_Binney Junction UP.pdf Uploaded: 9/23/2025 (1941 kb)
        • Pumping Plant_Binney Junction UP.pdf Uploaded: 9/23/2025 (7412 kb)
      • Levee_Plans
        • Levee_Plans_2025_07_21.pdf Uploaded: 8/29/2025 (63740 kb)
      • Floodgate_Plans
        • Floodgate_Plans_2025_08_28.pdf Uploaded: 8/29/2025 (1123 kb)
      • Structure_Plans
        • Foundation Plans
          • Foundation Report - Binney Junction UP Sac Sub.pdf Uploaded: 8/29/2025 (36237 kb)
          • Foundation Report - Marysville UP Valley Sub.pdf Uploaded: 8/29/2025 (32433 kb)
          • Foundation Report - Retaining Walls 1-6.pdf Uploaded: 8/29/2025 (89240 kb)
        • Retaining Walls 1-6 Plans
          • Retaining Wall 1 60_ Plans_7-17-25.pdf Uploaded: 8/29/2025 (8609 kb)
          • Retaining Wall 2 60_ Plans_7-17-25.pdf Uploaded: 8/29/2025 (1069 kb)
          • Retaining Wall 3 60_ Plans_7-17-25.pdf Uploaded: 8/29/2025 (4105 kb)
          • Retaining Wall 4 60_ Plans_7-18-25.pdf Uploaded: 8/29/2025 (6276 kb)
          • Retaining Wall 5 60_ Plans_7-18-25.pdf Uploaded: 8/29/2025 (6027 kb)
          • Retaining Wall 6 60_ Plans_7-18-25.pdf Uploaded: 8/29/2025 (7575 kb)
        • Marysville UP Plans
          • MarysvilleUP_60__Plans_7-17-25.pdf Uploaded: 8/29/2025 (17149 kb)
        • Binney Junction UP Plans
          • BinneyUP_60_ Plans_7-15-25.pdf Uploaded: 8/29/2025 (10405 kb)
      • Roadway_Plans
        • Roadway_Plans_2025_08_01.pdf Uploaded: 8/29/2025 (63297 kb)
      • Track_Plans
        • Spliced Track Plans
          • Track - Phase 1A.pdf Uploaded: 9/15/2025 (4308 kb)
          • Track - Phase 1B.pdf Uploaded: 9/15/2025 (1008 kb)
          • Track - Phase 1C.pdf Uploaded: 9/15/2025 (3218 kb)
          • Track - Phase 1D.pdf Uploaded: 9/15/2025 (1854 kb)
          • Track - Phase 2A.pdf Uploaded: 9/15/2025 (2436 kb)
          • Track - Phase 2B.pdf Uploaded: 9/15/2025 (1011 kb)
        • Track_Plans_2025_08_25.pdf Uploaded: 8/29/2025 (36722 kb)
  • 01-General
    • Granite Contract_Agreement Documents
      • INSURANCE REQUIREMENTS PDF-GCC.pdf Uploaded: 8/29/2025 (134 kb)
      • SAMPLE - HAULING AGREEMENT.Docx Uploaded: 9/12/2025 (98 kb)
      • SAMPLE - OP EQUIPMENT AGREEMENT.Docx Uploaded: 9/12/2025 (75 kb)
      • SAMPLE - PROF SERV AGREEMENT.Docx Uploaded: 9/12/2025 (88 kb)
      • SAMPLE - SAFETY ENVIRO ATT.pdf Uploaded: 8/29/2025 (674 kb)
      • SAMPLE - SPECIAL PROVISIONS.pdf Uploaded: 8/29/2025 (712 kb)
      • SAMPLE - SUBCONTRACT.docx Uploaded: 9/12/2025 (95 kb)
      • SAMPLE- LF PO.pdf Uploaded: 8/29/2025 (723 kb)
    • 03-0H1604_Main Contract_Federal Prevailing Wage Rates_10.21.25 PM.pdf Uploaded: 10/21/2025 (2509 kb)
  • _C Final Bid Documents 10.20.2025
    • Shoring
      • 24-071A Marysville UP Abut No 1 Ret Wall No 2 Shoring Plan Rev4.pdf Uploaded: 10/22/2025 (4398 kb)
      • 24-071B Marysville UP Abut No 3 Shoring Plan Rev4.pdf Uploaded: 10/22/2025 (4146 kb)
      • 24-071C Retaining Wall No.3 Shoring Plan Rev2.1.pdf Uploaded: 10/22/2025 (4589 kb)
      • 24-071D Retaining Wall No.5 Shoring Plan Rev3.pdf Uploaded: 10/22/2025 (2395 kb)
      • 24-071E Retaining Wall No.4 Shoring Plan Rev1.pdf Uploaded: 10/22/2025 (3893 kb)
      • 24-071F Binney UP Abutment Shoring Plan.pdf Uploaded: 10/24/2025 (4853 kb)
      • 24-071G Retaining Wall No.6 Shoring Plan.pdf Uploaded: 10/22/2025 (2225 kb)
      • 24-071H Retaining Wall No.1 Layout DRAFT.pdf Uploaded: 10/22/2025 (332 kb)
    • 03-0H1601-Combined-Plans.pdf Uploaded: 10/21/2025 (262237 kb)
    • 03-0H1601-SSPs-1.pdf Uploaded: 10/21/2025 (1022 kb)
    • 03-0H1604IH.pdf Uploaded: 10/21/2025 (733726 kb)
    • 03-0H1604_Main Contract_Federal Prevailing Wage Rates_10.21.25 PM-1.pdf Uploaded: 10/22/2025 (2509 kb)
    • 03-0H160_Main Contrract_Bid Item List_2025-10-10 v2.pdf Uploaded: 10/21/2025 (173 kb)
    • Binney Junction UP Marysville UP Pump Plant Plans.pdf Uploaded: 10/23/2025 (30722 kb)
    • Binney_junction_marysville_pp.pdf Uploaded: 10/24/2025 (30600 kb)
    • CROE Template_Exhibit C_UPRR Insurance Requirements for Subcontractors.pdf Uploaded: 10/22/2025 (214 kb)
    • SR 70 CMGC Updated Draft Construction Schedule 10-22-25.pdf Uploaded: 10/23/2025 (1136 kb)
  • _B Updated Project Information 10.13.2025
    • 06 - CVFPB Permit
      • CVFPB Permit 19755 BD.pdf Uploaded: 10/14/2025 (3301 kb)
    • 05 - Levee Geotechnical Design Report
      • Levee Geotechnical Design Report.pdf Uploaded: 10/14/2025 (10800 kb)
    • 15 - Construction Schedule
      • SR 70 CMGC_ Construction Schedule_ATP-007 08-11-25.PM.pdf Uploaded: 10/14/2025 (1145 kb)
    • 04 - Structure Foundation Reports
      • SAC23R161884_Retaining Walls FR_Compiled.pdf Uploaded: 10/14/2025 (1152 kb)
      • SAC23R162260_Marysville UP FR_Compiled.pdf Uploaded: 10/14/2025 (32266 kb)
      • SAC23R162264_Binney UP FR_Compiled.pdf Uploaded: 10/14/2025 (36798 kb)
    • 14 - Railroad Drainage Report
      • 0h160_Drainage_Report.pdf Uploaded: 10/14/2025 (742 kb)
    • 03 - Special Provisions
      • Structure Special Provisions
        • 03-0H160 Structure Specs 2025 10 10 1.pdf Uploaded: 10/14/2025 (637 kb)
      • Levee Special Provisions
        • MRL Specifications.pdf Uploaded: 10/14/2025 (2064 kb)
      • General Special Provisions
        • 03-0H1601-SSPs.pdf Uploaded: 10/14/2025 (731 kb)
    • 13 - UPRR Rail Train Instructions
      • UPRR Rail Train Instructions.pdf Uploaded: 10/14/2025 (134 kb)
    • 07 - UPRR Special Conditions
      • UPRR Special Conditions.pdf Uploaded: 10/14/2025 (91 kb)
    • 09 - UPRR Ballast Specifications
      • UPRR Ballast Specifications.pdf Uploaded: 10/14/2025 (846 kb)
    • 08 - UPRR Non-Expansive Engineered Fill Specs
      • UPRR Non-Expansive Engineered Fill.pdf Uploaded: 10/14/2025 (778 kb)
    • 02 - Plans
      • Roadway-Drainage-Electrical Plans
        • 03-0H1601-District-Plans.pdf Uploaded: 10/20/2025 (193046 kb)
      • Levee Plans
        • Cutoff Wall Cross Sections_Straddled-1.pdf Uploaded: 10/14/2025 (1843 kb)
        • Levee Plans.pdf Uploaded: 10/14/2025 (62092 kb)
      • Floodgate Plans
        • Binney Floodgate_100pct Plans_8-28-25.pdf Uploaded: 10/14/2025 (1123 kb)
      • Track Plans
        • Track Plans.pdf Uploaded: 10/14/2025 (26927 kb)
      • Structure Plans
        • Marysville UP
          • Marysville UP 100 Plans.pdf Uploaded: 10/14/2025 (17469 kb)
        • Binney UP
          • Binney UP - 100 Plans.pdf Uploaded: 10/14/2025 (10973 kb)
        • RW No 1 - 6
          • RW1 100 Plans.pdf Uploaded: 10/14/2025 (8586 kb)
          • RW2 100 Plans.pdf Uploaded: 10/14/2025 (961 kb)
          • RW3 100 Plans.pdf Uploaded: 10/14/2025 (4087 kb)
          • RW4 100 Plans.pdf Uploaded: 10/14/2025 (6276 kb)
          • RW5 100 Plans.pdf Uploaded: 10/14/2025 (6005 kb)
          • RW6 100 Plans.pdf Uploaded: 10/14/2025 (7718 kb)
      • As-Build Plans
        • Bridge 16-0018_Marysville UP-1.pdf Uploaded: 10/14/2025 (1250 kb)
        • Bridge 16-0026_Binney Junction UP-1.pdf Uploaded: 10/14/2025 (1941 kb)
        • Pumping Plant_Binney Junction UP-1.pdf Uploaded: 10/14/2025 (7412 kb)
    • 12 - UPRR Engineering Track Maintenance Work Procedure Docs
      • UPRR Engineering Track Maintenance Work Procedure Docs.pdf Uploaded: 10/14/2025 (48958 kb)
    • 01 - Bid Item List
      • 03-0H160_Main Contrract_Bid Item List_2025-10-10 002 1.pdf Uploaded: 10/14/2025 (190 kb)
    • 11 - UPRR Track Welding Rules Procedures
      • UPRR Track Welding Rules Procedures.pdf Uploaded: 10/14/2025 (617 kb)
    • 10 - UPRR Pipe Culvert Supplies
      • UPRR Pipe Culvert Suppliers.pdf Uploaded: 10/14/2025 (1100 kb)
  • 02-Work Codes
    • 03-0H1604 Binney_Work Code List.pdf Uploaded: 8/29/2025 (1430 kb)
  • __Notice to Bidders
    • 03-0H1604_Main Contract_Notice To Bidders_10.21.25-Updated.pdf Uploaded: 10/22/2025 (88 kb)
  • 03-Assistance | Requirements
    • Binney_Requirements_Assistance - ITB-1.pdf Uploaded: 10/22/2025 (540 kb)

Project Info

Project # 03-0H1604
Project Name SR-70 Binney Junction - 03-0H1604
Location 18th Street & East 24th Street
Address Map It 14th Street and Cemetery Road
City Marysville
State CA
Zip 95901
Bid Date November 18, 2025
Bid Time 12:00 PM
 
Scope

Dates

11.07.2025 - Tentative Date
Addendum 1 

11.18.2025 - 12:00 PM
Subcontractor|Supplier quotes due

Summer 2026
Construction is scheduled to begin 

Fall 2029
Anticipated completion
 

Full Project Description
This CMGC project, which in the City of Marysville, will improve SR-70 between 14th Street and Cemetery Road.

Main Contract Scope of Work:

State Route 70
  1. Widen the highway to five lanes, including two-way left-turn lanes and 8-foot shoulders
  2. Lower the existing roadway profile under the Marysville Underpass and the Binney Junction Underpass to increase railroad bridge clearances
  3. Construct eight concrete gravity walls to retain earth in the sag vertical curves 
  4. Realign 24th Street and construct new 24th Street / SR 70 intersection
  5. Construct new curb and gutter, sidewalk, and ADA ramps on each side of SR 70
  6. Construct new traffic signal at 16th Street/ SR 70 intersection and 24th Street/ SR 70 intersection
Union Pacific Railroad
  1. Replace the existing Marysville Underpass and Binney Junction Underpass; The two new bridges will have steel superstructures
  2. Realign a portion of the Valley Subdivision and Sacramento Subdivision tracks to align with the new railroad underpasses
  3. Construct six Type 1/ Type 5 concrete retaining walls to retain railroad embankment for the new track alignments 
Levee Improvements
  1. Relocate the east finger levee and a portion of the Marysville Ring Levee
  2. Construct new flood gate for the new track alignments
  3. Construct new soil-cement-bentonite cutoff walls via deep mix method 
Construction is scheduled to begin Summer 2026 and is anticipated to be complete in Fall 2029 
 
Estimated Total Project Cost
$160,000,000.00 
Plans
Final Bid Documentation available in Planroom

 
Other Info

Additional Documentation Available in the Plan Room
Assistance_Requirements
Work Codes
Granite Sample Contracts [General]

Granite intends to work cooperatively with all qualified firms seeking work on this project.
Granite is an Equal Opportunity Business Employer


 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
BINNEY JUNCTION - PRE-BID NOTIFICATION Deon Good 8/29/2025
BINNEY JUNCTION - PRE-BID NOTIFICATION - UPDATE 9.17.25 Deon Good 9/17/2025
BINNEY JUNCTION - PRE-BID NOTIFICATION - UPDATE 10.15.25 Deon Good 10/9/2025
BINNEY JUNCTION - BID REMINDER Deon Good 11/3/2025

Granite Construction Contacts

Company Contact Title Phone Extension Fax Email
Granite Construction Company Granite Construction - Sacramento Estimating Division 916-855-4400 sac.estimating@gcinc.com
Granite Construction Company Steve DeBlasio Estimator 916-855-4409 steven.deblasio@gcinc.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.