CT 01-0H5704 Hwy 101 Ukiah HMA & RHMA

Project Files

  • Supplemental Info
    • 01-0H5704-ADA-Ramp algn and profile.xml Uploaded: 9/8/2025 (20 kb)
    • 01-0H5704-DTM.xml Uploaded: 9/8/2025 (5912 kb)
    • 01-0H5704-EG_Surface.xml Uploaded: 9/8/2025 (5912 kb)
    • 01-0H5704-S1-FG-ddm.xml Uploaded: 9/8/2025 (167 kb)
    • 01-0H5704-S1-XS.pdf Uploaded: 9/8/2025 (4169 kb)
    • 01-0H5704-S1-xs.dgn Uploaded: 9/8/2025 (1528 kb)
    • 01-0H5704-S2-FG-ddm.xml Uploaded: 9/8/2025 (213 kb)
    • 01-0H5704-S2-XS.pdf Uploaded: 9/8/2025 (6091 kb)
    • 01-0H5704-S2-xs.dgn Uploaded: 9/8/2025 (1812 kb)
    • 01-0H5704-S3-FG-ddm.xml Uploaded: 9/8/2025 (98 kb)
    • 01-0H5704-S3-Left-ETW-SSN.pdf Uploaded: 9/8/2025 (623 kb)
    • 01-0H5704-S3-Left-ETW-XS.pdf Uploaded: 9/8/2025 (2265 kb)
    • 01-0H5704-S3-Left-ETW-xs.dgn Uploaded: 9/8/2025 (1328 kb)
    • 01-0H5704-S3-Left_ETW-FG-ddm.xml Uploaded: 9/8/2025 (78 kb)
    • 01-0H5704-S3-XS.pdf Uploaded: 9/8/2025 (2431 kb)
    • 01-0H5704-S3-xs.dgn Uploaded: 9/8/2025 (1296 kb)
    • 01-0H5704-S4-FG-ddm.xml Uploaded: 9/8/2025 (100 kb)
    • 01-0H5704-S4-XS.pdf Uploaded: 9/8/2025 (1846 kb)
    • 01-0H5704-S4-xs.dgn Uploaded: 9/8/2025 (1272 kb)
    • 01-0H5704-S_State_IC_Corr.csv Uploaded: 9/8/2025 (324 kb)
    • 01-0H5704-S_State_IC_Corr.dwg Uploaded: 9/8/2025 (77 kb)
    • 01-0H5704-T1-FG-ddm.xml Uploaded: 9/8/2025 (128 kb)
    • 01-0H5704-T1-XS.pdf Uploaded: 9/8/2025 (2917 kb)
    • 01-0H5704-T1-xs.dgn Uploaded: 9/8/2025 (2744 kb)
    • 01-0H5704-T2-FG-ddm.xml Uploaded: 9/8/2025 (83 kb)
    • 01-0H5704-T2-XS.pdf Uploaded: 9/8/2025 (4872 kb)
    • 01-0H5704-T2-xs.dgn Uploaded: 9/8/2025 (2744 kb)
    • 01-0H5704-T3-FG-ddm.xml Uploaded: 9/8/2025 (208 kb)
    • 01-0H5704-T3-XS.pdf Uploaded: 9/8/2025 (7044 kb)
    • 01-0H5704-T3-xs.dgn Uploaded: 9/8/2025 (2496 kb)
    • 01-0H5704-T4-FG-ddm.xml Uploaded: 9/8/2025 (186 kb)
    • 01-0H5704-T4-XS.pdf Uploaded: 9/8/2025 (5521 kb)
    • 01-0H5704-T4-xs.dgn Uploaded: 9/8/2025 (2744 kb)
    • 01-0H5704-T5-FG-ddm.xml Uploaded: 9/8/2025 (35 kb)
    • 01-0H5704-T5-XS.pdf Uploaded: 9/8/2025 (723 kb)
    • 01-0H5704-T5-xs.dgn Uploaded: 9/8/2025 (1204 kb)
    • 01-0H5704-T6-FG-ddm.xml Uploaded: 9/8/2025 (131 kb)
    • 01-0H5704-T6-XS.pdf Uploaded: 9/8/2025 (3905 kb)
    • 01-0H5704-T6-xs.dgn Uploaded: 9/8/2025 (2496 kb)
    • 01-0H5704-Telmage_IC_Corr.csv Uploaded: 9/8/2025 (884 kb)
    • 01-0H5704-Telmage_IC_Corr.dwg Uploaded: 9/8/2025 (76 kb)
    • 01-0H5704-Topo_Data.dgn Uploaded: 9/8/2025 (1721 kb)
    • 01-0H5704-algn and profile.xml Uploaded: 9/8/2025 (482 kb)
  • Specs
    • 01-0H5704IH.pdf Uploaded: 9/8/2025 (1917 kb)
    • 01-0H5704fw.pdf Uploaded: 9/8/2025 (102 kb)
    • 01-0H5704sp.pdf Uploaded: 9/8/2025 (994 kb)
  • Plans
    • 01-0H5704plans.pdf Uploaded: 9/8/2025 (75643 kb)

Project Info

Project # 01-0H5704
Project Name CT 01-0H5704 Hwy 101 Ukiah HMA & RHMA
Location Ukiah
Address
City Ukiah
State CA
Zip 95482
Bid Date October 29, 2025
Bid Time 2:00 PM
 
Scope Place asphalt, vegetation control & install high tension cable barrier

Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to Petroleum, Oil, Lubricants Supplier, Sand & Gravel Supplier (Bulk Item), Asphalt Supplier (Bulk Item), Concrete & Cement Supplier (Bulk Item), Drainage Systems Supplier, Construction Area Signs, Traffic Control System, Traffic Flagger, Temporary Railing (Type K), Plane Asphalt Concrete, Remove Concrete, Clearing & Grubbing, Develop Water Supply, Roadway Excavation, Imported Borrow, Temporary Erosion Control, Aggregate  Base (Ab), Seal Coat (Tack Coat), Paving Asphalt (Asphalt Concrete), Pavement Reinforcing Fabric, Place Asphalt Concrete Dike & Misc, Clean & Seal Pavement Joints – Rout & Seal Cracks, Concrete Structure, Minor Concrete Structure, Reinforcing Steel, Roadside Sign, Downdrain, Saw Cutting, Metal Beam Guard Railing, Metal Railing (Include Handrailing, Cable Railing, Bicycle Railing), Concrete Barrier (Permanent (All Concrete Barrier Types)", Crash Cushion, Thermoplastic Traffic Striping & Marking, Maintaining Existing Traffic Mgmt System Elements During Construction, Signal & Lighting (Furnishing, Installing, Modifying Or Removing ), Traffic Count Station, Pavement Profiling, Lead Compliance, SWPPP Planning, Water Truck, Street Sweeping Truck , Hazardous Substance Removal, Hazardous Waste Trucking, Trucker, Demolition

Plans

The DBE Contract goal is 17 percent. Federal-aid project no.: ACNH-Q101(455)E Please let us know which bid items will be covered in your proposal and if you can get 3rd DBE participation to help us meet the DBE Goal 17%.

 

The estimated cost of the project is $58,000,000.00

 

Plans and specifications are available at Caltrans https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project-calendar.php?q=01-0H5704. You’ll need a login and agree to a Non-Disclosure Agreement to access plans.

 

If you have any questions, please contact John Johnson at 707.367.5500 or email at John.Johnson@gcinc.com

 

All quotes should be emailed to NorthCoastEstimating@gcinc.com or sent via fax to 707.467.4143 on or before 11:00 am on bid day.

**Quotes not received by 11:00 AM on bid day may not be reviewed/evaluated**

Other Info

Requirements:
Firms must possess & provide current contractor’s license number & DIR Registration number on the quote.  No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal or engage in the performance of any contract for public work, unless currently registered to perform public work with the Dept of Industrial Relations https://efiling.dir.ca.gov/PWCR/Search.action

Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors#

California Access to Capital Program Financing Solutions for your small business! http://www.calbizfinance.org/cal_cert_biz_program.html

Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting.

 All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/quote-solicitation .

Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. 

 Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.

 An Equal Opportunity Employer

 

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.