T5 & Dutch Bros - Irmo

Project Files

  • Drawings
    • Dutch Bros_ACSMEP SET_07.09.25.pdf Uploaded: 10/1/2025 (46079 kb)
    • Take 5_Building Permit Set_07.11.25.pdf Uploaded: 10/1/2025 (62118 kb)
  • Additional Documents
    • 251898.20 Dutch Bros and Take 5 - Irmo SC Geo Report 6-27-25.pdf Uploaded: 10/1/2025 (3101 kb)
    • Broad River SC - Phase I ESA Report.pdf Uploaded: 10/1/2025 (17706 kb)
    • DURBAN ACQUISITIONS LLC IRMO 2025 TOPO-ALTA 8-27-25.pdf Uploaded: 10/1/2025 (956 kb)

Project Info

Project # 25054R
Project Name T5 & Dutch Bros - Irmo
Location Irmo, SC
Address Map It 10605 Broad River Road
City Irmo
State SC
Zip 29063
Bid Date October 16, 2025
Bid Time 3:00 PM
 
Scope This project consists of constructing a new 950 SF Dutch Bros Coffee and a 1,075 Take 5 Oil Change both of which are on the same property. This project also includes a ful Sitework Package in order to build these (2) buildings. The scope includes, but is not limited to the following:
  • Surveying
  • CIP Concrete
  • Masonry
  • Misc. Steel
  • Wood Framing
  • Shop Fabricated Roof Trusses
  • Rough Carpentry
  • Casework
  • Insulation
  • EIFS
  • Exterior Metal Wall Panels
  • TPO Roofing
  • Sheet Metal Roofing
  • Join Sealants
  • Waterproofing
  • Doors, Frames and Hardware
  • Glass Assemblies
  • Storefront
  • Painting
  • Fluid Applied Flooring
  • Hard Tile
  • Resilient Flooring
  • Wall Coverings 
  • FRP
  • Corner Guards
  • Acoustical Ceiling Tiles
  • Toilet Accessories
  • Fire Protection 
  • Canopies
  • Signage
  • Plumbing
  • Mechanical (HVAC)
  • Electrical
  • Site Lighting
  • Low Voltage
  • Sound
  • Access Controls
  • Site Demo
  • Erosion Control
  • Earthwork & Grading
  • Storm Drainage
  • Asphalt Paving
  • Site Concrete
  • Site Fencing
  • Landscaping
  • Irrigation
  • Site Utilities

NOTE: All pricing is to be separated between the Take 5 and the Dutch Bros Coffee as shown below:
  1. Sitework (Combined)
  2. Take 5 Oil Change
  3. Dutch Bros. Coffee 
Plans
  • Dutch Bros ACSMEP Set dated 07/09/25
  • Take 5 ASMEP Set dated 07/11/25
Other Info
  • Geo Tech Report dated 06/27/25
  • Phase I Report dated 03/21/25
  • ALTA Survey dated 08/27/25

GW Liles Construction Contacts

Company Contact Title Phone Extension Fax Email
Liles Construction Co., Inc. Darren Harrell Assistant Project Manager dharrell@lilesconstruction.com
Liles Construction Co., Inc. Noah Carlson Project Manager ncarlson@lilesconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.