CEDAR BLUFFS PUBLIC SCHOOLS – FCS, BAND & CUSTODIAL RENOVATION PROJECT

Project Files

  • 0 - SPECS 100 CDs Cedar Bluffs FCS Band Reno 2025-10-1.pdf Uploaded: 10/28/2025 (4036 kb)
  • Addendum_01_Cedar_Bluffs.pdf Uploaded: 10/28/2025 (510 kb)
  • Addendum_02_Cedar_Bluffs.pdf Uploaded: 11/7/2025 (10986 kb)
  • Addendum_03_Cedar_Bluffs.pdf Uploaded: 11/7/2025 (3851 kb)
  • Cedar Bluffs FCS Reno Drawings.pdf Uploaded: 10/28/2025 (21129 kb)

Project Info

Project #
Project Name CEDAR BLUFFS PUBLIC SCHOOLS – FCS, BAND & CUSTODIAL RENOVATION PROJECT
Location 110 E MAIN STREET, CEDAR BLUFFS, NEBRASKA 68015
Address Map It 110 E MAIN STREET
City CEDAR BLUFFS
State NE
Zip 68015
Bid Date November 13, 2025
Bid Time 2:00 PM
 
Scope Cheever Construction Company will be bidding as a Prime Contractor, and will be accepting proposals for the CEDAR BLUFFS PUBLIC SCHOOLS – FCS, BAND & CUSTODIAL RENOVATION PROJECT.  Your firm is invited to submit an offer for your scope of work, to Cheever Construction prior to the above bid time and date. 
Plans Cheever Online Plan Room
 Lincoln Builders Bureau, 5919 South 58th, Suite C, Lincoln, NE 68516; 402 421-8332  
 Omaha Builder's Exchange, 4159 south 94th Street, Omaha, NE 68127; 402-991-6906 
 Builders' Plan Service, 309 West 2nd Street, Grand Island, NE 68802; 308 382-9210 
Other Info
1. Phase 1: From February 2, 2026 until July 31, 2026. Includes FCS Rooms 162,
163 & 169, Custodial 160, Mechanical Mezzanine 201, Corridor 202, and the
Steel Egress Stairway. 

2. Phase 2: From May 20, 2026 until July 31, 2026. Includes Band Rooms 143, 146,
147A thru 147D, 148, Concessions 149, Counselor 141, Principal 139,
Elementary Vestibule 175 and Corridor 176.

3. Substantial Completion Date: July 31, 2026.

1.04 SCHEDULE OF ​ALTERNATES​
A. Alternate No. ​​​A-1​​​ - ADD WORK ASSOCIATED WITH ELEMENTARY VESTIBULE
RENOVATION AT VESTIBULE 175 AND CORRIDOR 176: In the proposal to the
Owner, as shown on the drawings, state the cost to ADD all work associated with the
Elementary Vestibule renovation at Vestibule 175 and Corridor 176, including demo of
the existing aluminum storefront, and add of the aluminum storefront framing, sliding
alum. window, carpet, ceiling, casework, steel counter supports, and dry sprinkler head.

B. Alternate No. A-2 - DELETE ALUMINUM WINDOW TYPE '6' AT FCS ROOM 162
AND SUBSTITUTE MASONRY WALL INFILL AT THE WINDOW AREA: In the
proposal to the Owner, as shown on the drawings, state the cost to DELETE window
type '6' at FCS Room 162 and substitute wall infill at window area with wall types 1C
and 2E. 

C. Alternate No. A-3 - ADD EPOXY FLOORING IN LIEU OF PAINTED CONCRETE
FLOOR AT CUSTODIAL OFFICE 160: In the proposal to the Owner, as shown on the
drawings, state the cost to DELETE the paint at the concrete floor in Custodial Office
160 and substitute a quartz epoxy floor system to match the adjacent existing system.
 The vinyl base shall remain in the base bid. 

D. Alternate No. A-4 - ADD TECTUM SOUND PANELS AT THE NORTH, SOUTH AND
EAST WALLS OF BAND ROOM 148: In the proposal to the Owner, as shown on the
drawings, state the cost to ADD Tectum sound panels at the north, south and east
walls of Band Room 148 with a C-40 mounting system and painted wood trim at the
bottom and exposed side edges. 

E. Alternate No. A-5 - ADD ALL WORK ASSOCIATED WITH THE STEEL STAIR
SERVING THE 2ND FLOOR: In the proposal to the Owner, as shown on the drawings,
state the cost to ADD the following work: Demo of masonry wall for door 202, demo of
select areas of existing exterior guard rail, the addition of galvanized steel stair,
guardrails and handrails serving the 2nd floor Mezzanine, east wall of Corridor 202,
doors 201 and 202, plywood and 2x wood ramp and landing with hand rails at Storage
200, electrical lighting at Corridor 202, re-routing of interior and exterior power conduit
at the area of door 202

F. Alternate No. M-1 - ADD A MINI-SPLIT MECHANICAL UNIT TO SERVE THE BAND
ROOM 148: In the proposal to the Owner, state the cost to ADD a mechanical mini-split HVAC system and the associated electrical work to serve the Band Room 148.


Cheever Construction Contacts

Company Contact Title Phone Extension Fax Email
Cheever Construction Brian Clinton Estimator / PM 402-477-6745 bclinton@cheeverconstruction.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.