DEN - Runway 7-25 Pavement Rehab

Project Files

  • Addendum 3
    • Addendum 3 202581731.pdf Uploaded: 11/18/2025 (163 kb)
    • RW 7-25 Construction Drawings Addendum 3 G-003.pdf Uploaded: 11/18/2025 (135 kb)
    • RW 7-25 Rehab Bid Tabs_IFB_Addendum No.3.xlsx Uploaded: 11/18/2025 (27 kb)
  • Addendum 2
    • Addendum 2 202581731-1.pdf Uploaded: 11/17/2025 (181 kb)
    • Const Drawings Addendum 2.pdf Uploaded: 11/17/2025 (3992 kb)
    • P101 Prep _ Removal of Existing Pvmts.pdf Uploaded: 11/17/2025 (1094 kb)
    • QA Document 2.pdf Uploaded: 11/17/2025 (14 kb)
    • RW 7-25 Rehab Bid Tabs_IFB_Addendum No.2.xlsx Uploaded: 11/17/2025 (29 kb)
  • Addendum 1
    • Addenda 01_DEN ROCIP5 Claims Manual_v1.0.pdf Uploaded: 11/7/2025 (3359 kb)
    • Addenda 01_DEN ROCIP5 Insurance Manual_v1.0.pdf Uploaded: 11/7/2025 (7620 kb)
    • Addenda 01_DEN ROCIP5 Safety Manual_v1.1.pdf Uploaded: 11/7/2025 (13996 kb)
    • Addenda 01_Div II Spec_P-621 Saw-Cut Grooves.pdf Uploaded: 11/7/2025 (103 kb)
    • Addendum 1 202581731.pdf Uploaded: 11/7/2025 (168 kb)
  • Addendum 2 202581731.pdf Uploaded: 11/17/2025 (181 kb)
  • DIA-Millstone Weber Sample Base Subcontract.pdf Uploaded: 11/4/2025 (265 kb)
  • IFB 202581731 11.3.25.pdf Uploaded: 11/4/2025 (24191 kb)
  • RW 7-25 Rehab div 1 specs.pdf Uploaded: 11/4/2025 (5409 kb)
  • RW 7-25 Rehab div 2 specs.pdf Uploaded: 11/4/2025 (7855 kb)
  • RW 7-25 Rehab_Bid Tabs_IFB.xlsx Uploaded: 11/4/2025 (37 kb)
  • RW7-25 Rehab CSPP.pdf Uploaded: 11/4/2025 (14981 kb)
  • RW7-25 Rehab Const Drawings.pdf Uploaded: 11/4/2025 (170606 kb)
  • Yellow Book - 2011 pwrr-032.1-standard_specifications_for_construction_general_contract_conditions.pdf Uploaded: 11/4/2025 (754 kb)

Project Info

Project # IFB 202581731
Project Name DEN - Runway 7-25 Pavement Rehab
Location Denver International Airport
Address Map It 8500 Pena Blvd
City Denver
State CO
Zip 80249
Bid Date November 21, 2025
Bid Time 5:00 PM
 
Scope
This project would be performed as a continuation of the DEN Pavement Management Program (PMP). The primary reason for this project is to improve the pavement condition of the Runway 7-25 complex as a means of sustaining the City’s current investment at DEN, fulfilling our FAA grant assurance obligations, and maintaining our Part 139 certification. Additionally, the City has been systematically updating portions of DEN’s airfield electrical and lighting systems from incandescent to LED as strategic opportunities and budget allow. This project would provide the operational closure window needed to complete that conversion for the Runway 7-25 complex, to replace aging and worn electrical infrastructure (as needed), and to remove and replace the worn surface painted pavement markings for the entire complex. 

Supplier Required:
  1. Concrete Sand & Stone
  2. Cement
  3. Fly-Ash
  4. Pavement Accessories
  5. Geotextile Fabric
Subcontractors Required:
  1. Quality Control
  2. Survey
  3. Traffic Control
  4. Erosion Control
  5. Demolition Sawcutting
  6. Demolition
  7. Concrete Crushing
  8. Asphalt & ATPB
  9. Saw / Seal
  10. Asphalt Sealcoating
  11. Concrete Spall Repairs
  12. Runway Grooving
  13. Pavement Markings
  14. Airfield Electrical
  15. Hourly Trucking
  16. Bulk Powder Hauling
Plans Plans have been uploaded to the Planroom. 

Addendums and other communication will be sent via Notices and uploaded to the Planroom.
Other Info GC bid date is 11/25/2025 @ 2pm, MW REQUESTS ALL QUOTES BE SUBMITTED BY 11/21/2025 BY COB.

This project is located inside the Perimeter Fence of the airport requiring increased Insurance and Badging requirements.  Additionally, this is a Prevailing Wage project and requires certified payrolls. ROCIP V will be utilized on this project and all subcontractors should be familiar with this requirement.

This project is expected to start in late March 2026 with a duration of ~123 days.

All subcontractors should assume they will be required to be badged.

Questions are to be submitted through BidNet.  Millstone Weber highly encourages subcontractors and supplier to ask their own questions on BidNet.  The Q&A Deadline is 11/13/2025 2:00 PM, if you have questions that you want Millstone Weber to submit please have them sent to us by no later than 11/12/2025 @ 2:00 PM.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum 1 Curtis Daniels 11/7/2025
ROCIP 5 Curtis Daniels 11/7/2025
Sawcutting Qtys Rebecca Vasel 11/13/2025
Batch Plant Quantities Rebecca Vasel 11/13/2025
Paving Accessories Rebecca Vasel 11/17/2025
Addendum 2 Rebecca Vasel 11/17/2025
Addendum 3 Rebecca Vasel 11/18/2025
MW - Unsuccessful Bid Curtis Daniels 12/1/2025

Millstone Weber, LLC Contacts

Company Contact Title Phone Extension Fax Email
Millstone Weber, LLC Curtis Daniels Chief Estimator, West 314-610-4068 curtis.daniels@millstoneweber.com
Millstone Weber, LLC Millstone Weber LLC Estimator 636-949-0038 636-949-3129 bids@millstoneweber.com
Millstone Weber, LLC Rebecca Vasel Estimator 720-638-8648 rebecca.vasel@millstoneweber.com