Project Name
|
Schuylkill Valley School District Field House
|
|
Location
|
929 Lakeshore Drive, Leesport, PA 19533
|
|
Address
|
Map It
929 Lakeshore Drive
|
|
City
|
Leesport
|
|
State
|
PA
|
|
Zip
|
19533
|
|
Bid Date
|
January 19, 2026
|
|
Bid Time
|
4:00 PM
|
|
|
| Scope |
This project consists of the new construction of a 47,305SF Field House at the Schuylkill Valley High School. The proposed construction work includes but is not limited to the following: preparation of site for the building and site amenities including on-site storm water infiltration system, new stadium plaza area with walkways from the ticket booth and from the high school parking lot; construction of a new 1-story pre-engineered building consisting of one gabled structure containing the gymnasium, fitness center, concessions, stadium toilets, team locker rooms and athletic trainer space. The second gabled structure contains the turf field and storage. For a full scope of work please see the complete set of project documents.
Additional Bid Info:
- Our bids are due to the owner on 01/20/2026 at 2:00pm. Please have your bids to us no later than 01/19/2026 at 4:00pm.
- Pre bid meeting on 01/08/2026 at 4:00pm if you need to see the site.
- Anticipated Start Date April 6, 2026
- Substantial Completion April 1, 2027
- There are 6 Unit Cost Allowances Please review (012100) and provide all that apply with your bid.
- There are 10 Unit Prices. Please review (012400) and provide all that apply with your bid.
- There are 6 Alternates. Please review (012300) and provide all that apply with your bid.
- This project is bidding as a multi-prime project. Plumbing, HVAC, and Electrical contractors are required to bid directly to the owner.
- Prevailing wages do apply. Please bid accordingly.
- No pre bid substitutions please bid with listed products.
- All RFI questions must be submitted by 1/13/2026 by 3:pm (7-days) prior to the bid date, please review documents early so we can get clarifications that may be needed.
- The project owner or eciConstruction will not pay any materials increases after a bid is submitted. Please include any required materials increases in your bid.
|
| Plans |
Plans are available in the plan room for download.
|
| Other Info |
*If you plan to bid, please click the green "YES" box below to insure we send you all future correspondence. If you are not bidding and no longer wish to receive correspondence on this project, please click the red "NO" box below and you will no longer receive emails regarding this project. If you wish to be removed permanently from our bid list on all future projects, please email your request to estimating@eciconstruction.com.
|
|