City of Leesburg Gas Department Building Improvement Project

Project Files

  • Drawings
    • Void
      • Main Office Building Bid Set - 03.10.26 (Addendum 02).pdf Uploaded: 3/10/2026 (97685 kb)
      • Main Office Building Bid Set - 03.24.26 Addendum 04.pdf Uploaded: 3/24/2026 (60266 kb)
      • Main Office Building Bid Set - 05.05.25.pdf Uploaded: 3/5/2026 (92799 kb)
      • Pole Barn Warehouse Bid Set - 03.24.26 Addendum 04.pdf Uploaded: 3/24/2026 (44920 kb)
      • Pole Barn Warehouse Bid Set - 05.05.25.pdf Uploaded: 3/5/2026 (43617 kb)
      • Pole Barn & Warehouse Bid Set - 03.10.26 (Addendum 02).pdf Uploaded: 3/10/2026 (45128 kb)
    • Revisions
      • Main Office Building
        • A103 - ROOF PLAN - 03.24.26 Addendum 03.pdf Uploaded: 3/24/2026 (159 kb)
        • A401 - FIRST FLOOR REFLECTED CEILING PLAN - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (676 kb)
        • A402 - SECOND FLOOR REFLECTED CEILING PLAN - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (230 kb)
        • A501 - ENLARGED PLAN AND INTERIOR ELEVATIONS - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (262 kb)
        • A502 - ENLARGED PLAN AND INTERIOR ELEVATIONS - 03.24.26 Addendum 03.pdf Uploaded: 3/24/2026 (272 kb)
        • A505 - ENLARGED PLAN AND INTERIOR ELEVATIONS - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (203 kb)
        • A507 - ENLARGED PLAN AND INTERIOR ELEVATIONS - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (191 kb)
        • A703 - ARCHITECTURAL DETAILS - WALLS - 03.24.26 Addendum 03.pdf Uploaded: 3/24/2026 (223 kb)
        • A705 - ARCHITECTURAL DETAILS - STAIRS - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (190 kb)
        • A901 - FINISHES PLAN - FIRST LEVEL - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (695 kb)
        • A902 - FINISHES PLAN - SECOND LEVEL - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (672 kb)
        • AD101 - DEMOLITION PLANS - 03.24.26 Addendum 03.pdf Uploaded: 3/24/2026 (237 kb)
        • G-001 - COVER SHEET - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (2240 kb)
        • G-003 - LIFE SAFETY PLAN - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (1161 kb)
        • G001 - COVER SHEET - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (4133 kb)
        • M003 - MECHANICAL SCHEDULES - 03.24.26 Addendum 03.pdf Uploaded: 3/24/2026 (243 kb)
        • P-001 - PLUMBING LEGEND NOTES ABBREVIATIONS - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (2323 kb)
        • P-101 - FIRST FLOOR PLAN - PLUMBING - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (725 kb)
        • P-401 - GAS RISER DIAGRAM - PLUMBING - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (445 kb)
        • P101 - FIRST FLOOR PLAN - PLUMBING - 03.24.26 Addendum 04.pdf Uploaded: 3/24/2026 (447 kb)
        • P401 - GAS RISER DIAGRAM - PLUMBING - 03.24.26 Addendum 04.pdf Uploaded: 3/24/2026 (229 kb)
        • S001 - STRUCTURAL NOTES - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (2477 kb)
      • Pole Barn & Warehouse
        • E-001 - ELECTRICAL LEGEND NOTES ABBREVIATIONS - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (1671 kb)
        • E-101 - FLOOR PLANS - ELECTRICAL - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (627 kb)
        • E-401 - ELECTRICAL RISER DIAGRAM PANEL SCHEDULE - 02.23.26 Addendum 02.pdf Uploaded: 3/10/2026 (743 kb)
        • G-001 - COVER SHEET - 02.23.26 Addendum 02-1.pdf Uploaded: 3/10/2026 (4459 kb)
        • M003 - MECHANICAL SCHEDULES - 03.24.26 Addendum 03-1.pdf Uploaded: 3/24/2026 (221 kb)
      • Civil
        • C200 - SITE PLAN - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (637 kb)
        • C300 - GRADING AND DRAINAGE PLAN - 03.24.26 Addendum 04.pdf Uploaded: 3/24/2026 (399 kb)
        • C300 - GRADING AND DRAINAGE PLAN - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (576 kb)
        • C400 - UTILITY PLAN - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (450 kb)
        • C500 - FIRE SAFETY PLAN - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (9522 kb)
    • Civil Bid Set - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (21730 kb)
    • Main Office Building Bid Set - 03.30.26 Addendum 07.pdf Uploaded: 3/30/2026 (49526 kb)
    • Pole Barn Warehouse Bid Set - 03.24.26 Addendum 04.pdf Uploaded: 3/30/2026 (26302 kb)
  • Specifications
    • Geotech Report 07.17.25 - Addendum 02 03.10.26.pdf Uploaded: 3/10/2026 (4979 kb)
  • Addendums
    • Addendum 05 - 03/24/26
      • Addendum 05 - 03.24.26.pdf Uploaded: 3/24/2026 (207 kb)
    • Addendum 08 - 04/10/26
      • Addendum 08 - 04.10.26.pdf Uploaded: 4/13/2026 (215 kb)
    • Addendum 02 - 03/10/26
      • Addendum 02 - 03.10.26 - Drawings.pdf Uploaded: 3/10/2026 (15772 kb)
      • Addendum 02 - 03.10.26 - Geotech Report 07.17.25.pdf Uploaded: 3/10/2026 (4979 kb)
      • Addendum 02 - 03.10.26 - Narrative.pdf Uploaded: 3/10/2026 (317 kb)
      • Addendum 02 - 03.10.26.pdf Uploaded: 3/10/2026 (21127 kb)
    • Addendum 03 - 03/24/26
      • Addendum 03 - 03.24.26 - Drawings.pdf Uploaded: 3/24/2026 (1269 kb)
      • Addendum 03 - 03.24.26.pdf Uploaded: 3/24/2026 (1502 kb)
    • Addendum 07 - 03/30/26
      • Addendum 07 - 03.30.26 - Drawings.pdf Uploaded: 3/30/2026 (17511 kb)
      • Addendum 07 - 03.30.26 - Narrative.pdf Uploaded: 3/30/2026 (260 kb)
    • Addendum 01 - 03/03/26
      • Addendum 01 - 03.03.26.pdf Uploaded: 3/5/2026 (214 kb)
    • Addendum 04 - 03/24/26
      • Addendum 04 - 03.24.26 - Drawings.pdf Uploaded: 3/24/2026 (1060 kb)
      • Addendum 04 - 03.24.26.pdf Uploaded: 3/24/2026 (1294 kb)
    • Addendum 06 - 03/26/26
      • Addendum 06 - 03.26.26.pdf Uploaded: 3/26/2026 (219 kb)
  • Documents
    • Invitation to Bid - 02.25.26.pdf Uploaded: 3/5/2026 (773 kb)
    • Sample Agreement - Fixed Unit Price Agreement - 02.25.26.pdf Uploaded: 3/5/2026 (251 kb)

Project Info

Project #
Project Name City of Leesburg Gas Department Building Improvement Project
Location Lake County
Address Map It 2116 Griffin Road
City Leesburg
State FL
Zip 34748
Bid Date April 14, 2026
Bid Time 5:00 PM
 
Scope
The scope of work for the City of Leesburg Gas Operations Center involves the construction of several new facilities. The Main Office Building is a two-story structure totaling approximately 5,000 square feet. The project also includes a new Pole Barn & Warehouse building with a footprint of 10,800 square feet. 
 
Construction activities across these buildings include the installation of new concrete flatwork, asphalt paving, and metal picket fencing. The work encompasses comprehensive mechanical, electrical, plumbing, and fire protection systems for all structures. Demolition of existing structures on the 2.41-acre site is also required to facilitate the new construction. The contractor is responsible for all site preparation, including the creation of a retention pond and necessary utility connections. Finally, the scope includes providing web-based project management software and conducting equipment demonstrations for the owner’s personnel.
Plans
Other Info

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum 2 James Hines 3/10/2026
Addendums 3, 4, 5 James Hines 3/24/2026
Addendum 6 James Hines 3/26/2026
Addendum 7 James Hines 3/30/2026
Addendum 8-Final Day for Bids! James Hines 4/13/2026

Mulligan Constructors, Inc. Contacts

Company Contact Title Phone Extension Fax Email
Mulligan Constructors, Inc. James Hines Estimator 407-654-6523 jhines@mulliganconstructors.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.