Project Info
|
| Project # |
26-0069 |
|
Project Name
|
South Annex Expansion
|
|
Location
|
Forest County Court House
|
|
Address
|
Map It
200 East Madison Street
|
|
City
|
Crandon
|
|
State
|
WI
|
|
Zip
|
54520
|
|
Bid Date
|
May 22, 2026
|
|
Bid Time
|
4:00 PM
|
|
|
| Scope |
The scope of the work includes interior demolition of plumbing and heating equipment and piping, new interior wall framing, insulation, floor prep for LVT tile and carpet, new wood doors in steel frames, installation and finishing of gypsum board walls, suspended acoustic ceilings, furring of existing exterior concrete walls, reconstruction of some wood framed floors, walls and ceilings, kitchen casework and counter tops, insulation of some existing concrete walls in the basement and storage with rigid foam, insulation of an attic area with blown-in-place cellulose, two accessible toilet rooms with grab bars, scald protection and mirrors, and an exterior aluminum prefabricated accessible ramp. Exterior walls on the first and second floors of the office side of the building will be insulated with closed cell spray foam. The HVAC system will be new and will include natural gas forced air with AC along with spot electric heaters in tempered storage areas. All electric wiring, fixtures and devices will be new and connected to a new 100-amp service. All work except for the exterior ramp is within the exterior envelope of the building.
|
| Plans |
Please see Plans and Spec's in Pipeline OPR tab above.
Walk Throughs can be set up by Calling Cliff O'Connor at 608-333-3576
|
| Other Info |
Project Manager is Cliff O'Connor. All project related questions should be directed to Cliff with Dixie in copy. Cliff's cell phone is 608-333-3576 Cliff's email is cliffo@kswconstruction.com
All bids and proposals should be emailed to Dixie at DixieL@kswconstruction.com
|
|