Project Info
|
| Project # |
24-44B |
|
Project Name
|
24-44B NEW HIGH SCHOOL AND FOOTBALL STADIUM FOR CLAY-CHALKVILLE HIGH SCHOOL PACKAGE B: HIGH SCHOOL BUILDING
|
|
Location
|
Jefferson County Board of Education
|
|
Address
|
Map It
2100 18th Street South
|
|
City
|
Birmingham
|
|
State
|
AL
|
|
Zip
|
35209
|
|
Bid Date
|
August 20, 2026
|
|
Bid Time
|
2:00 PM
|
|
|
| Scope |
Select demolition of existing buildings and site utilities, installation of new site utility and road infrastructure, and the construction of a new +/-350,000 GSF multi-story replacement high school in Pinson, AL for the Jefferson County Board of Education (JEFCOED). The building construction consists of poured-in-place concrete retaining walls, load bearing cmu with brick and EIFS veneer, prefabricated concrete plank and composite steel floor framing, asphalt shingle roofing on light gauge metal trusses, TPO membrane low-slope roofing on metal deck and steel joists, and full MEP building system infrastructure.
The facility houses General Academic, Science, Fine Arts and Career Tech classrooms and labs; Band and Choral Halls; Media Center; 800+ seat Theater; 1,500+ seat Competition Gym with adjacent Auxiliary Gym; 650+ seat Cafeteria with full-service commercial Kitchen; two(2) ICC 500 rated storm shelters; Administrative and Counseling Office suites.
|
| Plans |
General Contractors will need to complete a Pre-Bid Verification Form to gain access to the planroom and obtain the Application for Prequalification.
https://prequal.pipelinesuite.com/sub/form/3917/cl/1700/p/noICJR3VQAAYbcAgOmBexg
|
| Other Info |
Prequalification Submittals for General Contractors and Major Subcontractors will be received electronically by the office of the Architect, Lathan McKee Architects, on behalf of Jefferson County Board of Education, to the email address lathanprebidrfi@lathanmckee.com until 2:00 p.m., local time, on Thursday, July 9, 2026. General Contractors will need to complete a Pre-Bid Verification Form to request the Application for Prequalification.
There will be a Mandatory Pre-Bid Meeting held on-site at Clay-Chalkville High School, 6623 Roe Chandler Road, Pinson, AL 35126, on Wednesday, August 5, 2026, at 10:00 a.m. All Pre-Qualified General Contractors who intend to submit a bid are required to attend.
Please note that General Contractors are responsible for collecting the required documents from all major subcontractors and submitting them along with their prequalification application. Any submission from a General Contractor not including all Major Subcontractors' required documents shall be considered incomplete.
Subcontractors MUST contact the General Contractor(s) listed on the 24-44B General Contractors Prequalifying List for assistance with the prequalification process. The office of the Architect/Owner will not review any submission of a subcontractor except those received as part of a General Contractor's Application.
|
|