Hempfield HS Phase 3 South of Kauffman Projects

Project Files

  • Specs
    • DIV 09
      • 092116-GypBoard Uploaded: 6/24/2026 (141 kb)
      • 093000-Tiling Uploaded: 6/24/2026 (118 kb)
      • 095100-AcousticalCeilings Uploaded: 6/24/2026 (98 kb)
      • 096500-ResilientFlooring Uploaded: 6/24/2026 (98 kb)
      • 096723-ResinousFlooring Uploaded: 6/24/2026 (76 kb)
      • 099133-Painting Uploaded: 6/24/2026 (146 kb)
    • DIV 10
      • 101100-VisualDisplay Uploaded: 6/24/2026 (84 kb)
      • 101400-Signage Uploaded: 6/24/2026 (124 kb)
      • 102113-ToiletCompartments Uploaded: 6/24/2026 (75 kb)
      • 102813-ToiletAccessories Uploaded: 6/24/2026 (82 kb)
      • 104400-FireProtectionSpecialties Uploaded: 6/24/2026 (85 kb)
      • 105113-MetalLockers Uploaded: 6/24/2026 (92 kb)
      • 105713-HatAndCoatRacks Uploaded: 6/24/2026 (61 kb)
    • DIV 07
      • 070543-CladdingSupportSystems Uploaded: 6/24/2026 (77 kb)
      • 071100-Dampproofing Uploaded: 6/24/2026 (66 kb)
      • 071326-Waterproofing Uploaded: 6/24/2026 (83 kb)
      • 072100-ThermalInsulation Uploaded: 6/24/2026 (94 kb)
      • 072160-StructuralThermalBreaks Uploaded: 6/24/2026 (74 kb)
      • 072726-AirBarriers Uploaded: 6/24/2026 (95 kb)
      • 074113-MetalRoofPanels Uploaded: 6/24/2026 (121 kb)
      • 074213-MetalWallPanels Uploaded: 6/24/2026 (114 kb)
      • 075416-KEERoofing Uploaded: 6/24/2026 (170 kb)
      • 076200-MetalFlashing Uploaded: 6/24/2026 (111 kb)
      • 077100-RoofSpecialties Uploaded: 6/24/2026 (99 kb)
      • 077129-RoofExpansion Uploaded: 6/24/2026 (75 kb)
      • 077200-RoofAccessories Uploaded: 6/24/2026 (74 kb)
      • 078100-AppliedFireproofing Uploaded: 6/24/2026 (118 kb)
      • 078413-Firestopping Uploaded: 6/24/2026 (92 kb)
      • 078446-FireResistiveJointSystems Uploaded: 6/24/2026 (77 kb)
      • 079200-JointSealants Uploaded: 6/24/2026 (111 kb)
    • DIV 08
      • 081113-HMDoorsAndFrames Uploaded: 6/24/2026 (81 kb)
      • 081416-FlushWoodDoors Uploaded: 6/24/2026 (79 kb)
      • 081613-FRP Uploaded: 6/24/2026 (84 kb)
      • 083113-AccessDoors Uploaded: 6/24/2026 (69 kb)
      • 083323-OHCoilingDoors Uploaded: 7/9/2026 (129 kb)
      • 083326-OHCoilingGrilles Uploaded: 6/24/2026 (85 kb)
      • 084113-AlumFramedEntrances Uploaded: 6/24/2026 (114 kb)
      • 088000-Glazing Uploaded: 6/24/2026 (131 kb)
      • 088300-Mirrors Uploaded: 6/24/2026 (76 kb)
      • 088853-SecurityGlazing Uploaded: 6/24/2026 (124 kb)
      • 089013-Louvers Uploaded: 6/24/2026 (82 kb)
    • DIV 02
      • 020100-ProtectionOfExistingConditions Uploaded: 6/24/2026 (131 kb)
      • 024119-SelectiveStructureDemo Uploaded: 6/24/2026 (97 kb)
    • DIV 13
      • 133419-MetalBldSystems Uploaded: 6/24/2026 (147 kb)
    • DIV 03
      • 033000-CastInPlaceConcrete Uploaded: 6/24/2026 (355 kb)
      • 033001-CastInPlaceConcreteSite Uploaded: 6/24/2026 (100 kb)
      • 035400-HydraulicCementUnderlay Uploaded: 6/24/2026 (79 kb)
      • 036213-NonShrinkGrouting Uploaded: 6/24/2026 (67 kb)
    • DIV 21
      • DIV 21 Uploaded: 6/24/2026 (417 kb)
    • DIV 00
      • 001-Cover-3 Uploaded: 6/24/2026 (31 kb)
      • 002-TOC Uploaded: 6/24/2026 (110 kb)
      • 003-ITB Uploaded: 6/24/2026 (98 kb)
      • 004-InstructToBid Uploaded: 6/24/2026 (169 kb)
      • 005-eVerifyExhibitA Uploaded: 6/24/2026 (67 kb)
      • 006-Act114ExhibitB Uploaded: 6/24/2026 (870 kb)
      • 007-Act34ExhibitC Uploaded: 6/24/2026 (152 kb)
      • 008-Act24-82ExhibitD Uploaded: 6/24/2026 (788 kb)
      • 009-Act151ExhibitE Uploaded: 6/24/2026 (297 kb)
      • 010-Act168ExhibitF Uploaded: 6/24/2026 (216 kb)
      • 011-AvailableProjInfo-GeoTech Uploaded: 6/24/2026 (58216 kb)
      • 012-BidFormGC Uploaded: 6/24/2026 (122 kb)
      • 013-BidFormMEP Uploaded: 6/24/2026 (330 kb)
      • 014-BidBond Uploaded: 6/24/2026 (65 kb)
      • 015-AgmtOfSurety Uploaded: 6/24/2026 (61 kb)
      • 016-SubList Uploaded: 6/24/2026 (95 kb)
      • 017-QualificationStmt Uploaded: 6/24/2026 (94 kb)
      • 018-NonCollusionAffidavit Uploaded: 6/24/2026 (64 kb)
      • 019-AgmtAIA Uploaded: 6/24/2026 (280 kb)
      • 020-PandPBond Uploaded: 6/24/2026 (231 kb)
      • 021-CertsAndForms Uploaded: 6/24/2026 (196 kb)
      • 022-ClarificationForms Uploaded: 6/24/2026 (275 kb)
      • 023-GenCond Uploaded: 6/24/2026 (878 kb)
      • 024-PrevailingWages Uploaded: 6/24/2026 (1060 kb)
    • DIV 11
      • 113100-Appliances Uploaded: 6/24/2026 (68 kb)
      • 116623-GymEquip Uploaded: 6/24/2026 (133 kb)
    • DIV 01
      • 011000-Summary Uploaded: 6/24/2026 (116 kb)
      • 011200-MultiSummary Uploaded: 6/24/2026 (148 kb)
      • 012100-UnitPricesAndAllowances Uploaded: 6/24/2026 (156 kb)
      • 012300-Alternates Uploaded: 6/24/2026 (81 kb)
      • 012600-ContractModification Uploaded: 6/24/2026 (79 kb)
      • 012900-Payment Uploaded: 6/24/2026 (103 kb)
      • 013100-PMandCoordination Uploaded: 6/24/2026 (248 kb)
      • 013200-ConstProgressDoc Uploaded: 6/24/2026 (141 kb)
      • 013233-PhotoDocumentation Uploaded: 6/24/2026 (89 kb)
      • 013300-Submittals Uploaded: 6/24/2026 (147 kb)
      • 014000-QualityReq Uploaded: 6/24/2026 (132 kb)
      • 014100-Safety Uploaded: 6/24/2026 (102 kb)
      • 014200-References Uploaded: 6/24/2026 (118 kb)
      • 014339-Mockups Uploaded: 6/24/2026 (82 kb)
      • 015000-TempFacilities Uploaded: 6/24/2026 (213 kb)
      • 016000-ProductReq Uploaded: 6/24/2026 (251 kb)
      • 017300-Execution Uploaded: 6/24/2026 (113 kb)
      • 017329-CuttingAndPatch Uploaded: 6/24/2026 (120 kb)
      • 017419-ConstWasteMgmt Uploaded: 6/24/2026 (95 kb)
      • 017700-Closeout Uploaded: 6/24/2026 (114 kb)
      • 017823-OandM Uploaded: 6/24/2026 (125 kb)
      • 017839-ProjRecDocs Uploaded: 6/24/2026 (109 kb)
      • 017900-Demonstration Uploaded: 6/24/2026 (120 kb)
    • DIV 12
      • 122413-WindowShades Uploaded: 6/24/2026 (101 kb)
      • 123216-LaminateCasework Uploaded: 6/24/2026 (106 kb)
    • DIV 05
      • 051200-StructuralSteelFraming Uploaded: 6/24/2026 (203 kb)
      • 051213-ArchExposedStructSteelFraming Uploaded: 6/24/2026 (96 kb)
      • 052100-SteelJoistFraming Uploaded: 6/24/2026 (177 kb)
      • 053100-SteelDecking Uploaded: 6/24/2026 (174 kb)
      • 054000-ColdFormedMetalFraming Uploaded: 6/24/2026 (126 kb)
      • 054400-ColdFormedMetalTruss Uploaded: 6/24/2026 (230 kb)
      • 055000-MetalFab Uploaded: 6/24/2026 (114 kb)
    • DIV 06
      • 061000-RoughCarpentry Uploaded: 6/24/2026 (84 kb)
      • 061600-Sheathing Uploaded: 6/24/2026 (91 kb)
    • DIV 04
      • 042000-UnitMasonry Uploaded: 6/24/2026 (191 kb)
    • DIV 26
      • DIV 26 Uploaded: 6/24/2026 (5349 kb)
    • DIV 27
      • DIV 27 Uploaded: 6/24/2026 (1175 kb)
    • DIV 22
      • DIV 22 Uploaded: 6/24/2026 (807 kb)
    • DIV 23
      • DIV 23 Uploaded: 6/24/2026 (3179 kb)
    • DIV 32
      • 321100-UnboundPavementBaseCourses Uploaded: 6/24/2026 (73 kb)
      • 321216-AsphaltPaving Uploaded: 6/24/2026 (83 kb)
      • 321313-ConcretePaving Uploaded: 6/24/2026 (85 kb)
      • 321373-ConcretePavingJointSealants Uploaded: 6/24/2026 (75 kb)
      • 321723-PavementMarkings Uploaded: 6/24/2026 (66 kb)
      • 323000-SiteImprovements Uploaded: 6/24/2026 (112 kb)
      • 323119-DecorativeMetalFences Uploaded: 6/24/2026 (85 kb)
      • 329113-SoilPrep Uploaded: 6/24/2026 (95 kb)
      • 329200-TurfAndGrasses Uploaded: 6/24/2026 (114 kb)
      • 329300-Plants Uploaded: 6/24/2026 (130 kb)
    • DIV 33
      • 331000-FacilityWaterDist Uploaded: 6/24/2026 (344 kb)
      • 333000-FacilitySanitarySewers Uploaded: 6/24/2026 (114 kb)
      • 333001-AcceptanceTesting Uploaded: 6/24/2026 (118 kb)
      • 334100-StormUtilityDrainagePiping Uploaded: 6/24/2026 (146 kb)
    • DIV 28
      • DIV 28 Uploaded: 6/24/2026 (687 kb)
    • DIV 31
      • 311000-SiteClearing Uploaded: 6/24/2026 (102 kb)
      • 312000-EarthMoving Uploaded: 6/24/2026 (129 kb)
      • 312319-Dewatering Uploaded: 6/24/2026 (94 kb)
      • 312323-Backfill Uploaded: 6/24/2026 (62 kb)
  • Addendum 2
    • SpecsOnly-ADD2
      • 087101-DoorHdw-ADD2 Uploaded: 7/8/2026 (198 kb)
      • 097700-FiberglassReinforcedWallPanels-ADD2 Uploaded: 7/8/2026 (82 kb)
      • 105623-WireStorageShelving-ADD2 Uploaded: 7/8/2026 (78 kb)
      • 116833-BaseballFieldEquip-ADD2 Uploaded: 7/8/2026 (67 kb)
      • BidBond-ADD2 Uploaded: 7/8/2026 (102 kb)
      • TOC-ADD2 Uploaded: 7/8/2026 (130 kb)
    • DwgsOnly-ADD2
      • DO6.2-Site-ADD2 Uploaded: 7/8/2026 (436 kb)
      • FH6.1-Demo-ADD2 Uploaded: 7/8/2026 (458 kb)
      • FH6.1-DemoSite-ADD2 Uploaded: 7/8/2026 (458 kb)
      • FH6.5-Power-ADD2 Uploaded: 7/8/2026 (694 kb)
      • FH6.6-FireAlarm-ADD2 Uploaded: 7/8/2026 (527 kb)
      • FH6.7-Security-ADD2 Uploaded: 7/8/2026 (471 kb)
      • FH6.7-Security-ADD2 2 Uploaded: 7/8/2026 (471 kb)
      • MD6.3-Lighting-ADD2 Uploaded: 7/8/2026 (212 kb)
      • REF01-Demo-ADD2.pdf Uploaded: 7/9/2026 (936 kb)
      • REF02-Demo-ADD2.pdf Uploaded: 7/9/2026 (849 kb)
      • REF03-Layout-ADD2.pdf Uploaded: 7/9/2026 (834 kb)
      • REF04-Layout-ADD2.pdf Uploaded: 7/9/2026 (652 kb)
      • REF05-Grading-ADD2.pdf Uploaded: 7/9/2026 (1104 kb)
      • REF06-Grading-ADD2.pdf Uploaded: 7/9/2026 (872 kb)
      • REF07-Stormwater-ADD2.pdf Uploaded: 7/9/2026 (622 kb)
    • Addendum 2 Uploaded: 7/8/2026 (4651 kb)
  • Project Phasing
    • Schedule for Hempfield Phases.xlsx Uploaded: 7/2/2026 (19 kb)
  • Plans
    • Fieldhouse
      • 02 Architectural
        • 003-FH2.0-DoorFrameDtl Uploaded: 6/24/2026 (248 kb)
        • 004-FH2.1-Code Uploaded: 6/24/2026 (449 kb)
        • 005-FH2.2-ExistingCond Uploaded: 6/24/2026 (232 kb)
        • 006-FH2.3-ArchSite Uploaded: 6/24/2026 (554 kb)
        • 007-FH2.4-ConcessionDemo Uploaded: 6/24/2026 (523 kb)
        • 008-FH2.5-Concrete Uploaded: 6/24/2026 (1367 kb)
        • 009-FH2.6-RCPandRoof Uploaded: 6/24/2026 (1279 kb)
        • 010-FH2.7-RoofDtls Uploaded: 6/24/2026 (290 kb)
        • 011-FH2.8-ToiletAndLockerRm Uploaded: 6/24/2026 (551 kb)
        • 012-FH2.9-ToiletAndLockerRm Uploaded: 6/24/2026 (786 kb)
        • 013-FH2.10-ExtElev Uploaded: 6/24/2026 (1199 kb)
        • 014-FH2.11-ExtElev Uploaded: 6/24/2026 (1221 kb)
        • 015-FH2.12-BldSecs Uploaded: 6/24/2026 (812 kb)
        • 016-FH2.13-WallSecs Uploaded: 6/24/2026 (578 kb)
        • 017-FH2.14-WallSecs Uploaded: 6/24/2026 (304 kb)
        • 018-FH2.15-IntElev Uploaded: 6/24/2026 (421 kb)
        • 019-FH2.16-Millwork Uploaded: 6/24/2026 (376 kb)
        • 020-FH2.17-FinishSchedule Uploaded: 6/24/2026 (233 kb)
        • 021-FH2.18-Dtls Uploaded: 6/24/2026 (516 kb)
        • 022-FH2.19-SecDtls Uploaded: 6/24/2026 (518 kb)
        • 023-FH2.20-SecDtls Uploaded: 6/24/2026 (8435 kb)
      • 03 Structural
        • 024-FH3.00-GenNotes Uploaded: 6/24/2026 (1303 kb)
        • 025-FH3.01-LoadTables Uploaded: 6/24/2026 (1422 kb)
        • 026-FH3.02-Schedules Uploaded: 6/24/2026 (1518 kb)
        • 027-FH3.03-SpecialInspections Uploaded: 6/24/2026 (1409 kb)
        • 028-FH3.04-SpecialInspections Uploaded: 6/24/2026 (1411 kb)
        • 029-FH3.20-Foundations Uploaded: 6/24/2026 (1529 kb)
        • 030-FH3.21-RoofFraming Uploaded: 6/24/2026 (1467 kb)
        • 031-FH3.30-FoundationDtls Uploaded: 6/24/2026 (1839 kb)
        • 032-FH3.40-SuperstructureDtl Uploaded: 6/24/2026 (1602 kb)
        • 033-FH3.41-MetalDeck Uploaded: 6/24/2026 (1486 kb)
        • 034-FH3.42-SuperstructureDtl Uploaded: 6/24/2026 (1482 kb)
        • 035-FH3.51-TrussElev Uploaded: 6/24/2026 (1482 kb)
      • 01 General
        • 001-Cover-1 Uploaded: 6/24/2026 (20776 kb)
        • 002-PH0.0-SitePhasing-1 Uploaded: 6/24/2026 (1360 kb)
      • 06 Electrical
        • 050-FH6.0-SymbolSchedule Uploaded: 6/24/2026 (192 kb)
        • 051-FH6.1-Demo Uploaded: 6/24/2026 (459 kb)
        • 052-FH6.2-Site Uploaded: 6/24/2026 (469 kb)
        • 053-FH6.3-Demo Uploaded: 6/24/2026 (225 kb)
        • 054-FH6.4-Lighting Uploaded: 6/24/2026 (1508 kb)
        • 055-FH6.5-Power Uploaded: 6/24/2026 (693 kb)
        • 056-FH6.6-FireAlarm Uploaded: 6/24/2026 (556 kb)
        • 057-FH6.7-Security Uploaded: 6/24/2026 (454 kb)
        • 058-FH6.8-PowerRiserDiagram Uploaded: 6/24/2026 (166 kb)
        • 059-FH6.9-TelecomRiser Uploaded: 6/24/2026 (146 kb)
        • 060-FH6.10-Dtls Uploaded: 6/24/2026 (165 kb)
        • 061-FH6.11-Dtls Uploaded: 6/24/2026 (163 kb)
        • 062-FH6.12-Dtls Uploaded: 6/24/2026 (163 kb)
      • 04 Mechanical
        • 036-FH4.0-Notes Uploaded: 6/24/2026 (150 kb)
        • 037-FH4.1-Demo Uploaded: 6/24/2026 (192 kb)
        • 038-FH4.2-HVAC Uploaded: 6/24/2026 (605 kb)
        • 039-FH4.3-Roof Uploaded: 6/24/2026 (336 kb)
        • 040-FH4.4-Schedules Uploaded: 6/24/2026 (828 kb)
        • 041-FH4.5-Dtls Uploaded: 6/24/2026 (172 kb)
      • 05 Plumbing
        • 042-FH5.0-SchedulesAndNotes Uploaded: 6/24/2026 (181 kb)
        • 043-FH5.1-Demo Uploaded: 6/24/2026 (227 kb)
        • 044-FH5.2-Piping Uploaded: 6/24/2026 (815 kb)
        • 045-FH5.3-SanitaryWaste Uploaded: 6/24/2026 (917 kb)
        • 046-FH5.4-Enlarged Uploaded: 6/24/2026 (844 kb)
        • 047-FH5.5-Enlarged Uploaded: 6/24/2026 (1369 kb)
        • 048-FH5.6-Dtls Uploaded: 6/24/2026 (206 kb)
        • 049-FH5.7-Roof Uploaded: 6/24/2026 (368 kb)
    • Dugouts
      • 01 General
        • 001-Cover Uploaded: 6/24/2026 (20776 kb)
        • 002-PH0.0-SitePhasing Uploaded: 6/24/2026 (1360 kb)
      • 02 Architectural
        • 081-DO2.0-DoorSched Uploaded: 6/24/2026 (333 kb)
        • 082-DO2.1-IntElev Uploaded: 6/24/2026 (588 kb)
        • 083-DO2.2-Railing Uploaded: 6/24/2026 (6919 kb)
      • 03 Structural
        • 084-DO3.00-GenNotes Uploaded: 6/24/2026 (1382 kb)
        • 085-DO3.01-LoadTable Uploaded: 6/24/2026 (1445 kb)
        • 086-DO3.02-SpecialInspections Uploaded: 6/24/2026 (1324 kb)
        • 087-DO3.20-Secs Uploaded: 6/24/2026 (1812 kb)
      • 06 Electrical
        • 088-DO6.0-SymbolSchedule Uploaded: 6/24/2026 (175 kb)
        • 089-DO6.1-Demo Uploaded: 6/24/2026 (407 kb)
        • 090-DO6.2-Site Uploaded: 6/24/2026 (421 kb)
        • 091-DO6.3-Dtls Uploaded: 6/24/2026 (142 kb)
    • Maint Bld
      • 06 Electrical
        • 076-MB6.0-SymbolSchedule Uploaded: 6/24/2026 (189 kb)
        • 077-MB6.1-Site Uploaded: 6/24/2026 (272 kb)
        • 078-MB6.2-Site Uploaded: 6/24/2026 (393 kb)
        • 079-MB6.3-LightingAndPower Uploaded: 6/24/2026 (238 kb)
        • 080-MB6.4-Dtls Uploaded: 6/24/2026 (174 kb)
      • 04 Mechanical
        • 072-MB4.0-Notes Uploaded: 6/24/2026 (140 kb)
        • 073-MB4.1-HVAC Uploaded: 6/24/2026 (718 kb)
      • 05 Plumbing
        • 074-MB5.0-Notes Uploaded: 6/24/2026 (188 kb)
        • 075-MB5.1-Plumbing Uploaded: 6/24/2026 (289 kb)
      • 01 General
        • 001-Cover-2 Uploaded: 6/24/2026 (20776 kb)
        • 002-PH0.0-SitePhasing-2 Uploaded: 6/24/2026 (1360 kb)
      • 02 Architectural
        • 063-MB2.0-FinishSchedule Uploaded: 6/24/2026 (4948 kb)
        • 064-MB2.1-1stFl Uploaded: 6/24/2026 (375 kb)
        • 065-MB2.2-ExtElev Uploaded: 6/24/2026 (387 kb)
        • 066-MB2.3-IntElev Uploaded: 6/24/2026 (290 kb)
      • 03 Structural
        • 067-MB3.00-GenNotes Uploaded: 6/24/2026 (1311 kb)
        • 068-MB3.01-Schedules Uploaded: 6/24/2026 (1477 kb)
        • 069-MB3.02-SpecialInspections Uploaded: 6/24/2026 (1389 kb)
        • 070-MB3.20-1stFl Uploaded: 6/24/2026 (1510 kb)
        • 071-MB3.30-Dtls Uploaded: 6/24/2026 (1592 kb)
    • Thumbs Uploaded: 6/24/2026 (15 kb)
  • Addendum 3
    • SketchesOnly-ADD3
      • SKA001 Uploaded: 7/15/2026 (100 kb)
    • DwgsOnly-ADD3
      • C29-UtilityProfiles-ADD3 Uploaded: 7/15/2026 (1672 kb)
      • C47-UtilityDtl-ADD3 Uploaded: 7/15/2026 (5095 kb)
      • DO2.2-Railing-ADD3 Uploaded: 7/15/2026 (5478 kb)
      • FH2.17-Finish-ADD3 Uploaded: 7/15/2026 (220 kb)
      • FH2.8-ToiletAndLockerRm-ADD3 Uploaded: 7/15/2026 (540 kb)
      • FH4.5-Dtls-ADD3 Uploaded: 7/15/2026 (194 kb)
      • FH5.0-Notes-ADD3 Uploaded: 7/15/2026 (186 kb)
      • FH5.2-Piping-ADD3 Uploaded: 7/15/2026 (823 kb)
      • FH5.3-Piping-ADD3 Uploaded: 7/15/2026 (815 kb)
      • FH5.4-Enlarged-ADD3 Uploaded: 7/15/2026 (1075 kb)
      • FH5.5-Enlarged-ADD3 Uploaded: 7/15/2026 (1416 kb)
      • FH5.6-Dtls-ADD3 Uploaded: 7/15/2026 (341 kb)
      • FH5.7-Roof-ADD3 Uploaded: 7/15/2026 (376 kb)
      • FH6.4-Lighting-ADD3 Uploaded: 7/15/2026 (1504 kb)
      • MB2.2-ExtElev-ADD3 Uploaded: 7/15/2026 (389 kb)
      • MB4.1-HVAC-ADD3 Uploaded: 7/15/2026 (1733 kb)
      • MB5.0-Notes-ADD3 Uploaded: 7/15/2026 (188 kb)
      • MB5.1-Plumbing-ADD3 Uploaded: 7/15/2026 (272 kb)
      • PH0.0-Phasing-ADD3 Uploaded: 7/15/2026 (1339 kb)
    • Addendum 3 Uploaded: 7/15/2026 (26972 kb)
  • Addendum 1
    • SpecsOnly-ADD1
      • 095423-LinearMetalCeilings-ADD1 Uploaded: 7/1/2026 (96 kb)
      • 133419-MetalBldSystems-ADD1 Uploaded: 7/1/2026 (191 kb)
      • TOC-ADD1 Uploaded: 7/1/2026 (177 kb)
    • DwgsOnly-ADD1
      • C01-GenNotes-ADD1 Uploaded: 7/1/2026 (1242 kb)
      • C02-OandMNotes-ADD1 Uploaded: 7/1/2026 (931 kb)
      • C03-OandMNotes-ADD1 Uploaded: 7/1/2026 (4754 kb)
      • C04-OandMNotes-ADD1 Uploaded: 7/1/2026 (5374 kb)
      • C05-PCSMNotes-ADD1 Uploaded: 7/1/2026 (182 kb)
      • C06-PropertyAdjoiners-ADD1 Uploaded: 7/1/2026 (1907 kb)
      • C07-ExistingCond-ADD1 Uploaded: 7/1/2026 (2008 kb)
      • C08-ExistingCond-ADD1 Uploaded: 7/1/2026 (713 kb)
      • C09-ExistingCond-ADD1 Uploaded: 7/1/2026 (608 kb)
      • C10-ExistingCond-ADD1 Uploaded: 7/1/2026 (415 kb)
      • C11-Demo-ADD1 Uploaded: 7/1/2026 (1023 kb)
      • C12-Demo-ADD1 Uploaded: 7/1/2026 (838 kb)
      • C13-Demo-ADD1 Uploaded: 7/1/2026 (574 kb)
      • C14-Layout-ADD1 Uploaded: 7/1/2026 (641 kb)
      • C15-Layout-ADD1 Uploaded: 7/1/2026 (642 kb)
      • C16-Layout-ADD1 Uploaded: 7/1/2026 (477 kb)
      • C17-Grading-ADD1 Uploaded: 7/1/2026 (1569 kb)
      • C18-Grading-ADD1 Uploaded: 7/1/2026 (875 kb)
      • C19-Grading-ADD1 Uploaded: 7/1/2026 (1014 kb)
      • C20-Utility-ADD1 Uploaded: 7/1/2026 (741 kb)
      • C21-Utility-ADD1 Uploaded: 7/1/2026 (890 kb)
      • C22-Landscape-ADD1 Uploaded: 7/1/2026 (797 kb)
      • C23-Landscape-ADD1 Uploaded: 7/1/2026 (998 kb)
      • C24-Landscape-ADD1 Uploaded: 7/1/2026 (344 kb)
      • C25-Landscape-ADD1 Uploaded: 7/1/2026 (821 kb)
      • C26-Lighting-ADD1 Uploaded: 7/1/2026 (639 kb)
      • C27-Stormwater-ADD1 Uploaded: 7/1/2026 (677 kb)
      • C28-Stormwater-ADD1 Uploaded: 7/1/2026 (697 kb)
      • C29-UtilityProfiles-ADD1 Uploaded: 7/1/2026 (548 kb)
      • C30-UtilityProfiles-ADD1 Uploaded: 7/1/2026 (507 kb)
      • C31-SiteDtl-ADD1 Uploaded: 7/1/2026 (263 kb)
      • C32-SiteDtl-ADD1 Uploaded: 7/1/2026 (378 kb)
      • C33-SiteDtl-ADD1 Uploaded: 7/1/2026 (221 kb)
      • C34-SiteDtl-ADD1 Uploaded: 7/1/2026 (182 kb)
      • C35-SiteDtl-ADD1 Uploaded: 7/1/2026 (427 kb)
      • C36-SiteDtl-ADD1 Uploaded: 7/1/2026 (343 kb)
      • C37-SiteDtl-ADD1 Uploaded: 7/1/2026 (465 kb)
      • C38-StormwaterDtl-ADD1 Uploaded: 7/1/2026 (441 kb)
      • C39-StormwaterDtl-ADD1 Uploaded: 7/1/2026 (428 kb)
      • C40-StormwaterDtl-ADD1 Uploaded: 7/1/2026 (814 kb)
      • C41-BasinCrossSecs-ADD1 Uploaded: 7/1/2026 (828 kb)
      • C42-StormwaterDtl-ADD1 Uploaded: 7/1/2026 (2062 kb)
      • C43-StormwaterDtl-ADD1 Uploaded: 7/1/2026 (2783 kb)
      • C44-StormwaterDtl-ADD1 Uploaded: 7/1/2026 (3865 kb)
      • C45-StormwaterDtl-ADD1 Uploaded: 7/1/2026 (1313 kb)
      • C46-UtilityDtl-ADD1 Uploaded: 7/1/2026 (4373 kb)
      • C47-UtilityDtl-ADD1 Uploaded: 7/1/2026 (3390 kb)
      • C48-LightingDtl-ADD1 Uploaded: 7/1/2026 (6271 kb)
      • ESC1-Cover-ADD1 Uploaded: 7/1/2026 (2215 kb)
      • ESC10-Demo-ADD1 Uploaded: 7/1/2026 (984 kb)
      • ESC11-Demo-ADD1 Uploaded: 7/1/2026 (761 kb)
      • ESC12-Demo-ADD1 Uploaded: 7/1/2026 (852 kb)
      • ESC13-Demo-ADD1 Uploaded: 7/1/2026 (761 kb)
      • ESC14-Demo-ADD1 Uploaded: 7/1/2026 (533 kb)
      • ESC15-EandSA-ADD1 Uploaded: 7/1/2026 (2644 kb)
      • ESC16-EandSB-ADD1 Uploaded: 7/1/2026 (2758 kb)
      • ESC17-EandSC-ADD1 Uploaded: 7/1/2026 (1796 kb)
      • ESC18-EandSD-ADD1 Uploaded: 7/1/2026 (1128 kb)
      • ESC19-EandSE-ADD1 Uploaded: 7/1/2026 (1413 kb)
      • ESC2-Notes-ADD1 Uploaded: 7/1/2026 (901 kb)
      • ESC20-EandSF-ADD1 Uploaded: 7/1/2026 (1128 kb)
      • ESC21-EandSG-ADD1 Uploaded: 7/1/2026 (1211 kb)
      • ESC22-Dtls-ADD1 Uploaded: 7/1/2026 (506 kb)
      • ESC23-Dtls-ADD1 Uploaded: 7/1/2026 (545 kb)
      • ESC24-Dtls-ADD1 Uploaded: 7/1/2026 (448 kb)
      • ESC25-Dtls-ADD1 Uploaded: 7/1/2026 (6663 kb)
      • ESC26-Dtls-ADD1 Uploaded: 7/1/2026 (578 kb)
      • ESC3-Notes-ADD1 Uploaded: 7/1/2026 (1120 kb)
      • ESC4-Notes-ADD1 Uploaded: 7/1/2026 (798 kb)
      • ESC5-Notes-ADD1 Uploaded: 7/1/2026 (934 kb)
      • ESC6-Notes-ADD1 Uploaded: 7/1/2026 (866 kb)
      • ESC7-ExistingCond-ADD1 Uploaded: 7/1/2026 (1527 kb)
      • ESC8-Demo-ADD1 Uploaded: 7/1/2026 (1391 kb)
      • ESC9-Demo-ADD1 Uploaded: 7/1/2026 (1510 kb)
      • FH4.2-HVAC-ADD1 Uploaded: 7/1/2026 (632 kb)
      • FH4.3-Roof-ADD1 Uploaded: 7/1/2026 (351 kb)
      • FH5.5-Enlarged-ADD1 Uploaded: 7/1/2026 (1430 kb)
      • PH0.0-Phasing-ADD1 Uploaded: 7/1/2026 (1346 kb)
    • Addendum 1 Uploaded: 7/1/2026 (106473 kb)
  • Addendum 04_Combined Uploaded: 7/21/2026 (36408 kb)
  • Addendum 05_Combined Uploaded: 7/21/2026 (750 kb)

Project Info

Project #
Project Name Hempfield HS Phase 3 South of Kauffman Projects
Location Hempfield High School
Address Map It 200 Stanley Avenue
City Landisville
State PA
Zip 17538
Bid Date July 23, 2026
Bid Time 2:00 PM
 
Scope

We are inviting subcontractors and suppliers to provide pricing for Hempfield HS Phase 3 South of Kauffman Projects. Located at Hempfield High School, 200 Stanley Avenue, Landisville, PA 17538. 

This project is being bid under separate prime contracts for General Construction, Mechanical Construction, Electrical Construction, and Plumbing Construction. The work includes a new 12,000 gsf Fieldhouse, 5,000 gsf new Pre-Engineered Maintenance Building, new dugouts, Renovations to the Existing Fieldhouse and Concessions Structures. Sitework includes new parking lot, sidewalks, stormwater basin and landscaping.. Please see documents for a full scope of work. 



Key Project Info:

  • GC Bids are due July 23, 2026 at 2:00 PM. Please have your quotes to us by July 22nd at 12:00 PM. 
  • A non-mandatory pre-bid meeting is scheduled for June 30th, 2026 at 10:00 AM.
  • For additional site visits contact: Kim James 717-898-5632
  • Questions are due 5 days prior to the bid due date. Please submit RFI's as early as possible no later than 5 days prior to bid date.
  • Unit Prices & Allowances - 28ea. See section 012100 (Provide all that apply with bid)
  • Alternates - 3ea. See Section 012300 (Provide all that apply with bid)
  • Anticipated Notice to Proceed September 15th, 2026. 
    • Phasing/Multiple Milestone Dates for Various Aspects of Project (Dug Outs, Existing Field House, New Field House, Maitenance Building, etc.) Please Review PH0.0 Site Phasing Schedule and bid accordingly. 
  • Substantial Completion August 1st, 2028
  • This project is subject to PA Prevailing Wage rates, please bid accordingly. The wages are contained in 024 Prevailing Wages.
  • Multiple prime contracts, we are biding the GC contract (GC, MC, EC, PC). 
  • Prebid substitutions are allowed, must be submitted 10 days prior to bid date. 
  • The project owner or eciConstruction will not pay any materials increases after a bid is submitted. Please include any required materials increases in your bid. 
Please review all drawings, specifications, addenda, and existing condition reports before submitting pricing. Existing condition information includes any provided geotechnical, utility, hazardous materials, and soil management documents that should be carefully reviewed as part of your scope evaluation.

Please provide your quotation with all applicable labor, materials, equipment, freight, supervision, testing, and closeout requirements included for your trade. Clearly identify any exclusions, qualifications, alternates, and long-lead items with your proposal.

Please send your pricing by July 22nd at 12:00 PM

Plans Project documents can be found and downoladed form the Pipeline planroom.
Other Info *If you plan to bid, please click the green "YES" box below to insure we send you all future correspondence. If you are not bidding and no longer wish to receive correspondence on this project, please click the red "NO" box below and you will no longer receive emails regarding this project. If you wish to be removed permanently from our bid list on all future projects, please email your request to estimating@eciconstruction.com. 

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
Addendum 1 (BID EXTENSION) Jen Piconi 7/1/2026
Project Phasing Brandon Stum 7/2/2026
Addendum 2 Jen Piconi 7/8/2026
Addendum 3 Jen Piconi 7/15/2026
Addendum 4 Brandon Stum 7/21/2026
Addendum 5 Brandon Stum 7/21/2026
BID REMINDER (DUE TOMORROW) - Hempfield HS Phase 3 Nick Yinger 7/22/2026

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.