GC - Warrior Run JR-SR High School

Project Files

  • Sketches
    • ASK-1 NEW WALL LAYOUT AT GYM VESTIBULE Uploaded: 10/5/2026 (231 kb)
    • ASK-2 SECTION AT GYM VESTIBULE ENTRY Uploaded: 10/5/2026 (334 kb)
    • ASK-3 SECTIONS AREA C Uploaded: 10/5/2026 (801 kb)
    • ASK-4 WALL SECTION Uploaded: 10/5/2026 (248 kb)
    • ASK-5 - PLAN DETAIL AND ELEVATIONS Uploaded: 10/5/2026 (227 kb)
    • ASK-6 - WALL SECTION Uploaded: 10/5/2026 (212 kb)
    • ASK-7 - WALL SECTION Uploaded: 10/5/2026 (210 kb)
    • Thumbs Uploaded: 10/5/2026 (19 kb)
  • Addenda
    • Addendum 1 Uploaded: 10/7/2026 (51023 kb)
    • Addendum 2 Uploaded: 10/7/2026 (16805 kb)
    • Addendum 3 Uploaded: 10/7/2026 (1816 kb)
    • Addendum 4 Uploaded: 10/7/2026 (5678 kb)
    • Addendum 5 Uploaded: 10/7/2026 (429 kb)
    • Addendum 6 Uploaded: 10/7/2026 (1151 kb)
    • Thumbs-3 Uploaded: 10/7/2026 (59 kb)
  • Drawings
    • Plumbing
      • P0.1 PLUMB LEGENDS NOTES Uploaded: 10/7/2026 (456 kb)
      • P1.1 FNDTN PLN -AREA B ADDN 2-1 Uploaded: 10/7/2026 (226 kb)
      • P1.1 FNDTN PLN-AREA B Uploaded: 10/7/2026 (229 kb)
      • P1.10 PART FLR PLN Uploaded: 10/7/2026 (214 kb)
      • P1.10 PART FLR PLN ADDN 2-1 Uploaded: 10/7/2026 (221 kb)
      • P1.11 PART FLR PLN Uploaded: 10/7/2026 (218 kb)
      • P1.11 PART FLR PLN ADDN 2-1 Uploaded: 10/7/2026 (226 kb)
      • P1.12 PART FLR PLN Uploaded: 10/7/2026 (275 kb)
      • P1.12 PART FLR PLN ADDN 2-1 Uploaded: 10/7/2026 (281 kb)
      • P1.2 FNDTN PLN -AREA C Uploaded: 10/7/2026 (265 kb)
      • P1.2 FNDTN PLN-AREA C ADDN 2-1 Uploaded: 10/7/2026 (252 kb)
      • P1.3 FNDTN PLN -AREA F Uploaded: 10/7/2026 (152 kb)
      • P1.4 FNDTN 1ST FLR PLN -AREA G Uploaded: 10/7/2026 (272 kb)
      • P1.5 PART 1ST FLR PLN -AREA B Uploaded: 10/7/2026 (264 kb)
      • P1.5 PART 1ST FLR PLN-AREA B ADDN 2-1 Uploaded: 10/7/2026 (279 kb)
      • P1.6 PART 1ST FLR PLN -AREA C Uploaded: 10/7/2026 (286 kb)
      • P1.6 PART 1ST FLR PLN-AREA C ADDN 2-1 Uploaded: 10/7/2026 (303 kb)
      • P1.7 1ST FLR PLN -AREA F Uploaded: 10/7/2026 (231 kb)
      • P1.8 2ND FLR PLN -AREA B Uploaded: 10/7/2026 (212 kb)
      • P1.9 2ND FLR PLN -AREA G Uploaded: 10/7/2026 (216 kb)
      • P6.1 RISER DIAGRAM Uploaded: 10/7/2026 (244 kb)
      • P6.2 RISER DIAGRAM Uploaded: 10/7/2026 (252 kb)
      • P6.3 RISER DIAGRAM Uploaded: 10/7/2026 (205 kb)
      • P7.1 PLUMBING DETAILS Uploaded: 10/7/2026 (562 kb)
      • P7.2 PLUMBING DETAILS Uploaded: 10/7/2026 (558 kb)
      • P7.3 PLUMBING DETAILS Uploaded: 10/7/2026 (226 kb)
      • P9.1 PLUMBING EQUIP NOTES SCHED Uploaded: 10/7/2026 (262 kb)
      • PD1.1 FNDTN PLN DEMO -AREA B Uploaded: 10/7/2026 (204 kb)
      • PD1.2 FNDTN PLN DEMO -AREA C Uploaded: 10/7/2026 (241 kb)
      • PD1.2 FNDTN PLN DEMO-AREA C ADDN 2-1 Uploaded: 10/7/2026 (249 kb)
      • PD1.3 FNDTN PLN DEMO -AREA F Uploaded: 10/7/2026 (172 kb)
      • PD1.4 FNDTN 1ST FLR PLN DEMO -AREA G Uploaded: 10/7/2026 (295 kb)
      • PD1.4 FNDTN 1ST FLR PLN DEMO-AREA G ADDN 4-1 Uploaded: 10/7/2026 (304 kb)
      • PD1.5 1ST FLR DEMO -AREA B Uploaded: 10/7/2026 (258 kb)
      • PD1.5 1ST FLR DEMO-AREA B ADDN 2-1 Uploaded: 10/7/2026 (258 kb)
      • PD1.5 1ST FLR DEMO-AREA B ADDN 4-1 Uploaded: 10/7/2026 (263 kb)
      • PD1.6 1ST FLR DEMO -AREA C Uploaded: 10/7/2026 (270 kb)
      • PD1.6 1ST FLR DEMO-AREA C ADDN 2-1 Uploaded: 10/7/2026 (262 kb)
      • PD1.7 1ST FLR PLN DEMO - AREA F Uploaded: 10/7/2026 (220 kb)
      • PD1.8 2ND FLR PLN DEMO -AREA B Uploaded: 10/7/2026 (188 kb)
      • PD1.9 2ND FLR PLN DEMO -AREA G Uploaded: 10/7/2026 (218 kb)
      • PD1.9 2ND FLR PLN DEMO-AREA G ADDN 4-1 Uploaded: 10/7/2026 (223 kb)
      • Thumbs-8 Uploaded: 10/7/2026 (52 kb)
    • Structural
      • S-0.0 GEN STRUCTURAL NOTES Uploaded: 10/7/2026 (278 kb)
      • S-0.1 GEN STRUCTURAL NOTES SCHED Uploaded: 10/7/2026 (248 kb)
      • S-0.2 SCHED OF SPECIAL INSPECTIONS Uploaded: 10/7/2026 (410 kb)
      • S-1.0 FOUND PLN -AREA B PART AREA G GROUND FLR PLN Uploaded: 10/7/2026 (650 kb)
      • S-1.1 FOUND PLN -AREA C Uploaded: 10/7/2026 (731 kb)
      • S-1.2 ROOF FRAMING PLN -AREA B Uploaded: 10/7/2026 (507 kb)
      • S-1.3 ROOF FRAMING PLN -AREA C Uploaded: 10/7/2026 (479 kb)
      • S-1.4 DUNNAGE FRAMING PLN -AREA B Uploaded: 10/7/2026 (363 kb)
      • S-2.0 SECTIONS Uploaded: 10/7/2026 (378 kb)
      • S-3.0 TYPICAL DETAILS Uploaded: 10/7/2026 (543 kb)
      • S-3.1 TYPICAL DETAILS Uploaded: 10/7/2026 (575 kb)
      • S-3.2 TYPICAL DETAILS Uploaded: 10/7/2026 (230 kb)
    • General
      • A0.0 - COVER SHEET Uploaded: 10/7/2026 (838 kb)
      • A0.1 - CODE ANALYSIS NOTES Uploaded: 10/7/2026 (248 kb)
      • A0.2 - CODE ANALYSIS NOTES Uploaded: 10/7/2026 (295 kb)
      • A0.3 - AREA PLN OCCUPANCY Uploaded: 10/7/2026 (1327 kb)
      • A0.4 - PHASING PLNS Uploaded: 10/7/2026 (3274 kb)
    • Mechanical
      • M0.1 LEGEND ABBR Uploaded: 10/7/2026 (538 kb)
      • M1.1 1ST FLR PLN -AREA B Uploaded: 10/7/2026 (340 kb)
      • M1.1 1ST FLR PLN-AREA B ADDN 2-1 Uploaded: 10/7/2026 (349 kb)
      • M1.1 1ST FLR PLN-AREA B ADDN 3-1 Uploaded: 10/7/2026 (359 kb)
      • M1.2 1ST FLR PLN -AREA C Uploaded: 10/7/2026 (414 kb)
      • M1.2 1ST FLR PLN-AREA C ADDN 2-1 Uploaded: 10/7/2026 (432 kb)
      • M1.2 1ST FLR PLN-AREA C ADDN 3-1 Uploaded: 10/7/2026 (448 kb)
      • M1.3 1ST 2ND FLR PLN -AREA G Uploaded: 10/7/2026 (326 kb)
      • M1.4 ROOF PART PLN Uploaded: 10/7/2026 (159 kb)
      • M1.4 ROOF PART PLN ADDN 2-1 Uploaded: 10/7/2026 (169 kb)
      • M1.4 ROOF PT PLN ADDN 3-1 Uploaded: 10/7/2026 (180 kb)
      • M1.5 ROOF PART PLN Uploaded: 10/7/2026 (173 kb)
      • M1.5 ROOF PART PLN ADDN 2-1 Uploaded: 10/7/2026 (197 kb)
      • M1.5 ROOF PT PLN ADDN 3-1 Uploaded: 10/7/2026 (206 kb)
      • M2.1 1ST FLR PLN -AREA B -HVAC PIPING Uploaded: 10/7/2026 (288 kb)
      • M2.1 1ST FLR PLN-AREA B ADDN 2-1 Uploaded: 10/7/2026 (297 kb)
      • M2.1 1ST FLR PLN-AREA B-ADDN 3-1 Uploaded: 10/7/2026 (308 kb)
      • M2.2 1ST FLR PLN -AREA C -HVAC PIPING Uploaded: 10/7/2026 (294 kb)
      • M2.2 1ST FLR PLN-AREA C ADDN 2-1 Uploaded: 10/7/2026 (308 kb)
      • M2.2 1ST FLR PLN-AREA C-ADDN 3-1 Uploaded: 10/7/2026 (326 kb)
      • M7.1 AIR DISTRIB SYSTEM DTLS Uploaded: 10/7/2026 (456 kb)
      • M7.2 HYDRO PIPING MISC DTLS Uploaded: 10/7/2026 (507 kb)
      • M7.3 MISC DTLS Uploaded: 10/7/2026 (383 kb)
      • M8.1 TYP PKGD DX SZVF AHU W DUCT MOUNTED HC CNTRL Uploaded: 10/7/2026 (681 kb)
      • M8.2 TYP DX SZVF AHI CONTROL DIAGRAMS Uploaded: 10/7/2026 (622 kb)
      • M8.3 MISC CONTROL DIAGRAMS Uploaded: 10/7/2026 (366 kb)
      • M9.1 AHU SCHED Uploaded: 10/7/2026 (623 kb)
      • M9.1 AHU SCHED ADDN 2-1 Uploaded: 10/7/2026 (630 kb)
      • MD1.1 1ST FLR DEMO PLN -AREA B Uploaded: 10/7/2026 (296 kb)
      • MD1.2 1ST FLR DEMO -AREA C Uploaded: 10/7/2026 (274 kb)
      • MD1.2 1ST FLR DEMO-AREA C ADDN 2-1 Uploaded: 10/7/2026 (282 kb)
      • MD1.3 1ST 2ND FLR DEMO PLN -AREA G Uploaded: 10/7/2026 (343 kb)
      • MD1.4 ROOF PT PLN-DEMO Uploaded: 10/7/2026 (5042 kb)
      • MD2.1 1ST FLR DEMO-AREA B-HVAC PIPING Uploaded: 10/7/2026 (259 kb)
      • MD2.2 1ST FLR DEMO -AREA C-HVAC PIPING ADDN 2-1 Uploaded: 10/7/2026 (182 kb)
      • MD2.2 1ST FLR DEMO-AREA C-HVAC PIPING Uploaded: 10/7/2026 (174 kb)
      • Thumbs-7 Uploaded: 10/7/2026 (24 kb)
    • Electrical
      • E0.1 LEGENDS ABBR Uploaded: 10/7/2026 (156 kb)
      • E0.1 LEGENDS ABBR ADDN 2-1 Uploaded: 10/7/2026 (275 kb)
      • E1.1 1ST FLR PLN -AREA B -PWR Uploaded: 10/7/2026 (373 kb)
      • E1.1 1ST FLR PLN-AREA B-PWR ADDN 2-1 Uploaded: 10/7/2026 (515 kb)
      • E1.1 1ST FLR PLN-AREA B-PWR ADDN 4-1 Uploaded: 10/7/2026 (487 kb)
      • E1.2 1ST FLR PLN-AREA C-PWR Uploaded: 10/7/2026 (431 kb)
      • E1.2 1ST FLR PLN-AREA C-PWR ADDN 4-1 Uploaded: 10/7/2026 (543 kb)
      • E1.3 1ST FLR PLN-AREA F-PWR Uploaded: 10/7/2026 (248 kb)
      • E1.3 1ST FLR PLN-AREA F-PWR ADDN 2-1 Uploaded: 10/7/2026 (371 kb)
      • E1.4 1ST 2ND FLR PLNS-AREA G-POWER Uploaded: 10/7/2026 (438 kb)
      • E1.5 2ND FLR PLN-AREA B-POWER Uploaded: 10/7/2026 (184 kb)
      • E1.6 ROOF PLN Uploaded: 10/7/2026 (217 kb)
      • E1.7 1ST FLR PLN-AREA D ADDN 2-1 Uploaded: 10/7/2026 (243 kb)
      • E2.0 LIGHT FIXTURE SCHED Uploaded: 10/7/2026 (134 kb)
      • E2.0 LIGHT FIXTURE SCHED ADDN 2-1 Uploaded: 10/7/2026 (247 kb)
      • E2.1 1ST FLR PLN-AREA B-LIGHTING Uploaded: 10/7/2026 (241 kb)
      • E2.1 1ST FLR PLN-AREA B-LIGHTING ADDN 2-1 Uploaded: 10/7/2026 (367 kb)
      • E2.2 1ST FLR PLN-AREA C-LIGHTING Uploaded: 10/7/2026 (440 kb)
      • E2.2 1ST FLR PLN-AREA C-LIGHTING ADDN 2-1 Uploaded: 10/7/2026 (550 kb)
      • E2.2 1ST FLR PLN-AREA C-LIGHTING ADDN 4-1 Uploaded: 10/7/2026 (550 kb)
      • E3.1 1ST FLR PLN-AREA B-FIRE ALARM Uploaded: 10/7/2026 (189 kb)
      • E3.1 1ST FLR PLN-AREA B-FIRE ALARM ADDN 2-1 Uploaded: 10/7/2026 (316 kb)
      • E3.1 1ST FLR PLN-AREA B-FIRE ALARM ADDN 6-1 Uploaded: 10/7/2026 (366 kb)
      • E3.2 1ST FLR PLN-AREA C-FIRE ALARM Uploaded: 10/7/2026 (389 kb)
      • E3.2 1ST FLR PLN-AREA C-FIRE ALARM ADDN 2-1 Uploaded: 10/7/2026 (505 kb)
      • E3.2 1ST FLR PLN-AREA C-FIRE ALARM ADDN 4-1 Uploaded: 10/7/2026 (500 kb)
      • E3.2 1ST FLR PLN-AREA C-FIRE ALARM ADDN 6-1 Uploaded: 10/7/2026 (568 kb)
      • E5.1 SCHEMATIC PWR RISER DIAGRAM-DEMO Uploaded: 10/7/2026 (119 kb)
      • E5.2 SCHEMATIC PWR RISER DIAGRAM Uploaded: 10/7/2026 (119 kb)
      • E5.3 SCHEMATIC TELECOMM PA RISER DIAGRAM Uploaded: 10/7/2026 (121 kb)
      • E5.4 SCHEMATIC FIRE ALARM RISER DIAGRAM Uploaded: 10/7/2026 (116 kb)
      • E6.1 DTLS Uploaded: 10/7/2026 (149 kb)
      • E6.1 ELECT DTLS ADDN 2-1 Uploaded: 10/7/2026 (292 kb)
      • E7.1 MECH EQUIPMENT SCHED ADDN 2-1 Uploaded: 10/7/2026 (316 kb)
      • E7.1 MECHANICAL EQUIPMENT SCHED Uploaded: 10/7/2026 (156 kb)
      • E7.2 PANELBOARD SCHED Uploaded: 10/7/2026 (164 kb)
      • E7.2 PANELBOARD SCHED ADDN 2-1 Uploaded: 10/7/2026 (328 kb)
      • E7.2 PANELBOARD SCHED ADDN 4-1 Uploaded: 10/7/2026 (279 kb)
      • ED1.1 1ST FLR PLN -AREA B Uploaded: 10/7/2026 (224 kb)
      • ED1.1 1ST FLR PLN-AREA B-DEMO ADDN 2-1 Uploaded: 10/7/2026 (349 kb)
      • ED1.2 1ST FLR PLN-AREA C Uploaded: 10/7/2026 (224 kb)
      • ED1.2 1ST FLR PLN-AREA C-DEMO ADDN 4-1 Uploaded: 10/7/2026 (334 kb)
      • ED1.3 1ST FLR PLN-AREA F Uploaded: 10/7/2026 (229 kb)
      • ED1.4 1ST 2ND FLR PLNS-AREA G Uploaded: 10/7/2026 (406 kb)
      • ED1.5 2ND FLR PLN-AREA B Uploaded: 10/7/2026 (168 kb)
      • Thumbs-6 Uploaded: 10/7/2026 (54 kb)
    • Architectural
      • A0.3 AREA PLN OCCUPANCY ADDN 2-1 Uploaded: 10/7/2026 (1077 kb)
      • A1.0 OA FLR PLNS Uploaded: 10/7/2026 (943 kb)
      • A1.0 OA FLR PLNS ADDN 2-1 Uploaded: 10/7/2026 (720 kb)
      • A1.1 1ST FLR PLN -AREA B Uploaded: 10/7/2026 (886 kb)
      • A1.1 1ST FLR PLN-AREA B ADDN 2-1 Uploaded: 10/7/2026 (853 kb)
      • A1.2 2ND FLR PLN -AREA B Uploaded: 10/7/2026 (332 kb)
      • A1.2 2ND FLR PLN-AREA B ADDN 2-1 Uploaded: 10/7/2026 (331 kb)
      • A1.3 1ST FLR PLN -AREA C Uploaded: 10/7/2026 (973 kb)
      • A1.3 1ST FLR PLN -AREA C ADDN 4-1 Uploaded: 10/7/2026 (921 kb)
      • A1.3 1ST FLR PLN-AREA C ADDN 2-1 Uploaded: 10/7/2026 (943 kb)
      • A1.4 1ST FLR PLN -AREA F Uploaded: 10/7/2026 (372 kb)
      • A1.5 1ST 2ND FLR PLNS - AREA G Uploaded: 10/7/2026 (536 kb)
      • A1.6 PLN DTLS Uploaded: 10/7/2026 (471 kb)
      • A10.0 FINISH LEGEND SCHED Uploaded: 10/7/2026 (249 kb)
      • A10.1 1ST FLR FIN PLN-AREA B Uploaded: 10/7/2026 (954 kb)
      • A10.2 2ND FLR FIN PLN-AREA B Uploaded: 10/7/2026 (337 kb)
      • A10.3 1ST FLR FIN PLN-AREA C Uploaded: 10/7/2026 (753 kb)
      • A10.4 1ST FLR FIN PLN SCHED-AREA F Uploaded: 10/7/2026 (347 kb)
      • A10.5 1ST 2ND FLR FIN PLNS-AREA G Uploaded: 10/7/2026 (540 kb)
      • A2.1 - EXT ELVTNS - AREAS B C ADDN 1-1 Uploaded: 10/7/2026 (1150 kb)
      • A2.1 EXT ELVTNS -AREAS B C Uploaded: 10/7/2026 (1155 kb)
      • A2.1 EXT ELVTNS-AREAS B C ADDN 2-1 Uploaded: 10/7/2026 (1127 kb)
      • A3.1 - BUILDING SECTION ADDN 1-1 Uploaded: 10/7/2026 (2886 kb)
      • A3.1 BUILDING SECTIONS Uploaded: 10/7/2026 (2877 kb)
      • A3.2 - BUILDING SECTIONS ADDN 1-1 Uploaded: 10/7/2026 (1866 kb)
      • A3.2 BUILDING SECTIONS Uploaded: 10/7/2026 (1864 kb)
      • A4.1 WALL SECTIONS Uploaded: 10/7/2026 (786 kb)
      • A4.2 WALL SECTIONS Uploaded: 10/7/2026 (660 kb)
      • A4.3 WALL SECTIONS Uploaded: 10/7/2026 (596 kb)
      • A5.0 OA ROOF PLN Uploaded: 10/7/2026 (696 kb)
      • A5.1 - PART ROOF PLNS ADDN 1-1 Uploaded: 10/7/2026 (410 kb)
      • A5.1 PART ROOF PLNS Uploaded: 10/7/2026 (364 kb)
      • A5.2 ROOF DTLS Uploaded: 10/7/2026 (587 kb)
      • A6.1 1ST FLR RFLCTD CEILING PLN - AREA B Uploaded: 10/7/2026 (628 kb)
      • A6.2 - 1ST FLR RFLCTD CEILING PLN - AREA C ADDN 1-1 Uploaded: 10/7/2026 (553 kb)
      • A6.2 1ST FLR RFLCTD CEILING PLN - AREA C Uploaded: 10/7/2026 (549 kb)
      • A6.2 1ST FLR RFLCTD CEILING PLN-AREA C ADDN 4-1 Uploaded: 10/7/2026 (535 kb)
      • A7.1 - RAMP STAIR - AREA B ADDN 1-1 Uploaded: 10/7/2026 (1324 kb)
      • A7.1 RAMP STAIR -AREA B Uploaded: 10/7/2026 (1278 kb)
      • A7.2 STAIR RAMP -AREA C Uploaded: 10/7/2026 (1213 kb)
      • A7.3 WALKWAY RAMP -AREA C Uploaded: 10/7/2026 (1608 kb)
      • A7.4 EXISTING STAIR ST-04 ST-05 Uploaded: 10/7/2026 (1250 kb)
      • A8.1 INT PLN -1ST FLR AREA B Uploaded: 10/7/2026 (578 kb)
      • A8.10 - ENLRGD INT PLNS ELVTNS ADDN 1-1 Uploaded: 10/7/2026 (295 kb)
      • A8.10 PLNS ELVTNS-LOBBY MERCH AREAS Uploaded: 10/7/2026 (286 kb)
      • A8.11 - ENLRGD INT PLNS ELVTNS - ADDN 1-1 Uploaded: 10/7/2026 (472 kb)
      • A8.11 ENLRGD INT PLNS ELVTNS Uploaded: 10/7/2026 (464 kb)
      • A8.12 PLNS ELVTNS-GIRLS BOYS LOCKER RM Uploaded: 10/7/2026 (610 kb)
      • A8.13 - ENLRGD INT PLNS ELVTNS-TOILET RMS ADDN 1-1 Uploaded: 10/7/2026 (487 kb)
      • A8.13 ENLRGD INT PLNS ELVTNS-TOILET ROOMS Uploaded: 10/7/2026 (481 kb)
      • A8.14 ENLRGD INT PLNS ELVTNS-CHANGING ROOMS Uploaded: 10/7/2026 (272 kb)
      • A8.15 PLNS ELVTNS - LOCKER TOILET ROOMS Uploaded: 10/7/2026 (326 kb)
      • A8.16 PLNS ELVTNS-SHOWERS CHANGING ROOMS Uploaded: 10/7/2026 (320 kb)
      • A8.17 ENLRGD INT PLNS ELVTNS-TOILET ROOMS Uploaded: 10/7/2026 (357 kb)
      • A8.18 ENLRGD INT PLNS ELVTNS-TOILET ROOMS Uploaded: 10/7/2026 (315 kb)
      • A8.19 ENLRGD INT PLNS ELVTNS-TOILET ROOMS Uploaded: 10/7/2026 (388 kb)
      • A8.2 INT PLN -2ND FLR AREA B Uploaded: 10/7/2026 (330 kb)
      • A8.20 ENLRGD INT PLNS ELVTNS-TOILET ROOMS Uploaded: 10/7/2026 (401 kb)
      • A8.21 ENLRGD INT PLNS ELVTNS-TOILET ROOMS Uploaded: 10/7/2026 (355 kb)
      • A8.22 ENLRGD INT PLNS ELVTNS-TOILET ROOMS Uploaded: 10/7/2026 (309 kb)
      • A8.23 WALL PANEL DTLS Uploaded: 10/7/2026 (229 kb)
      • A8.24 ACCESSIBILITY DTLS Uploaded: 10/7/2026 (323 kb)
      • A8.3 INT PLN -1ST FLR AREA C Uploaded: 10/7/2026 (517 kb)
      • A8.4 INT PLN -1ST FLR AREA F Uploaded: 10/7/2026 (364 kb)
      • A8.5 INT PLN -1ST 2ND FLR AREA G Uploaded: 10/7/2026 (525 kb)
      • A8.6 PLNS ELEVAT DTLS - LGI EXEC. MEETING Uploaded: 10/7/2026 (496 kb)
      • A8.7 ENLGD INT PLNS ELVTNS-FITNESS CENTER Uploaded: 10/7/2026 (460 kb)
      • A8.8 ENLRGD INT PLNS ELVTNS-SNACK SALES Uploaded: 10/7/2026 (277 kb)
      • A8.9 ENLRGD INT PLNS ELVTNS-LOBBY Uploaded: 10/7/2026 (418 kb)
      • A9.1 DOOR SCHED TYPES DTLS Uploaded: 10/7/2026 (456 kb)
      • A9.2 - ALUMINUM FRAME SYSTEMS DTLS ADDN 1-1 Uploaded: 10/7/2026 (392 kb)
      • A9.2 ALUMINIUM FRAME SYSTEMS DTLS Uploaded: 10/7/2026 (389 kb)
      • AD1.0 - OA DEMO FLR PLNS ADDN 1-1 Uploaded: 10/7/2026 (1590 kb)
      • AD1.0 OA DEMO FLR PLNS Uploaded: 10/7/2026 (1881 kb)
      • AD1.1 1ST 2ND FLR DEMO PLN-AREA B Uploaded: 10/7/2026 (337 kb)
      • AD1.2 2ND FLR DEMO PLN-AREA B Uploaded: 10/7/2026 (330 kb)
      • AD1.3 - 1ST FLR DEMO PLN-AREA C ADDN 1-1 Uploaded: 10/7/2026 (552 kb)
      • AD1.3 1ST FLR DEMO PLN -AREA C ADDN 2-1 Uploaded: 10/7/2026 (556 kb)
      • AD1.3 1ST FLR DEMO PLN-AREA C Uploaded: 10/7/2026 (580 kb)
      • AD1.3 1ST FLR DEMO PLN-AREA C ADDN 4-1 Uploaded: 10/7/2026 (539 kb)
      • AD1.4 1ST FLR DEMO PLN-AREA F Uploaded: 10/7/2026 (356 kb)
      • AD1.5 1ST 2ND FLR DEMO PLN - AREA G Uploaded: 10/7/2026 (509 kb)
      • Thumbs-4 Uploaded: 10/7/2026 (69 kb)
    • Civil
      • C0.0 NOTES-1 Uploaded: 10/7/2026 (918 kb)
      • C1.0 EXISTING CONDTITIONS PLN-C1.0 Uploaded: 10/7/2026 (836 kb)
      • C2.0 DEMO PLN-2.0 Uploaded: 10/7/2026 (646 kb)
      • C3.0 SITE IMPROVEMENT PLN-3 Uploaded: 10/7/2026 (517 kb)
      • C4.0 - GRADING DRAINAGE PLN-4 ADDN 1-1 Uploaded: 10/7/2026 (990 kb)
      • C4.0 GRADING DRAIN PLN ADDN 2-1 Uploaded: 10/7/2026 (1007 kb)
      • C4.0 GRADING DRAINAGE PLN-4 Uploaded: 10/7/2026 (886 kb)
      • C5.0 DETAILS-5 Uploaded: 10/7/2026 (488 kb)
      • ESC-1 COVER SHEET Uploaded: 10/7/2026 (1064 kb)
      • ESC-2 OA EXISTING COND PLN Uploaded: 10/7/2026 (1203 kb)
      • ESC-3 EXISTING COND PLN Uploaded: 10/7/2026 (1201 kb)
      • ESC-4 EROSION SEDIMENT CONT PLN Uploaded: 10/7/2026 (1903 kb)
      • ESC-5 ESC DETAILS Uploaded: 10/7/2026 (942 kb)
      • ESC-6 ESC DETAILS Uploaded: 10/7/2026 (1066 kb)
      • ESC-7 ESC DETAILS Uploaded: 10/7/2026 (807 kb)
      • ESC-8 ESC NOTES Uploaded: 10/7/2026 (1703 kb)
      • ESC-9 FLOW PATHS TO RECEIVING SURFACE WATER Uploaded: 10/7/2026 (2287 kb)
      • LD1.0 COVER SHEET Uploaded: 10/7/2026 (1507 kb)
      • LD10.0 SITE DETAILS Uploaded: 10/7/2026 (732 kb)
      • LD10.1 SITE DETAILS Uploaded: 10/7/2026 (864 kb)
      • LD10.2 BMP-1 DETAILS Uploaded: 10/7/2026 (1043 kb)
      • LD10.2 BMP-1 DETAILS DUPE Uploaded: 10/7/2026 (1104 kb)
      • LD10.3 BMP-2 DETAILS Uploaded: 10/7/2026 (982 kb)
      • LD10.3 BMP-2 DETAILS DUPE Uploaded: 10/7/2026 (1044 kb)
      • LD10.4 STORMWATER DETAILS Uploaded: 10/7/2026 (811 kb)
      • LD10.4 STORMWATER DETAILS DUPE Uploaded: 10/7/2026 (872 kb)
      • LD2.0 OA TRACT SKETCH PLN Uploaded: 10/7/2026 (1326 kb)
      • LD2.1 ROJECT AREA EXISTING COND PLN Uploaded: 10/7/2026 (1106 kb)
      • LD3.0 DEMO PLN Uploaded: 10/7/2026 (990 kb)
      • LD4.0 SITE IMPROVEMENT PLN Uploaded: 10/7/2026 (937 kb)
      • LD5.0 GRADING DRAINAGE PLN Uploaded: 10/7/2026 (1731 kb)
      • LD5.0 GRADING DRAINAGE PLN DUPE Uploaded: 10/7/2026 (1670 kb)
      • LD6.0 UTILITY PLN Uploaded: 10/7/2026 (1348 kb)
      • LD7.0 STORM WATER PLN PROFILES Uploaded: 10/7/2026 (1780 kb)
      • LD7.1 STORM WATER PLN PROFILES Uploaded: 10/7/2026 (1806 kb)
      • LD7.2 STORM WATER PLN PROFILES Uploaded: 10/7/2026 (1711 kb)
      • LD8.0 ACCESS DRIVE PLN PROFILES Uploaded: 10/7/2026 (1786 kb)
      • LD9.0 SANITARY SEWER PLN PROFILES DTLS Uploaded: 10/7/2026 (1843 kb)
      • PCSM-1 COVER SHEET Uploaded: 10/7/2026 (1042 kb)
      • PCSM-10 POST-DEVELOP WATERSHED Uploaded: 10/7/2026 (1786 kb)
      • PCSM-11 SUB-DEVELOP WATERSHED M Uploaded: 10/7/2026 (1816 kb)
      • PCSM-12 FLOW PATHS-RECEIVING SURFACE WATER Uploaded: 10/7/2026 (2258 kb)
      • PCSM-2 OA EXIST COND PLN Uploaded: 10/7/2026 (1155 kb)
      • PCSM-3 EXIST COND PLN Uploaded: 10/7/2026 (1211 kb)
      • PCSM-8 CONSTRUCTION SEQUENCE Uploaded: 10/7/2026 (933 kb)
      • PCSM-9 PRE-DEVELOP WATERSHED MAP Uploaded: 10/7/2026 (1167 kb)
      • Thumbs-5 Uploaded: 10/7/2026 (21 kb)
    • Thumbs-9 Uploaded: 10/7/2026 (68 kb)
    • _Combined Drawings Uploaded: 10/7/2026 (109703 kb)
  • Addenda Drawings
    • A0.3 AREA PLN OCCUPANCY ADDN 2 Uploaded: 10/7/2026 (1077 kb)
    • A1.0 OA FLR PLNS ADDN 2 Uploaded: 10/7/2026 (720 kb)
    • A1.1 1ST FLR PLN-AREA B ADDN 2 Uploaded: 10/7/2026 (853 kb)
    • A1.2 2ND FLR PLN-AREA B ADDN 2 Uploaded: 10/7/2026 (331 kb)
    • A1.3 1ST FLR PLN -AREA C ADDN 4 Uploaded: 10/7/2026 (921 kb)
    • A1.3 1ST FLR PLN-AREA C ADDN 2 Uploaded: 10/7/2026 (943 kb)
    • A2.1 - EXT ELVTNS - AREAS B C ADDN 1 Uploaded: 10/7/2026 (1150 kb)
    • A2.1 EXT ELVTNS-AREAS B C ADDN 2 Uploaded: 10/7/2026 (1127 kb)
    • A3.1 - BUILDING SECTION ADDN 1 Uploaded: 10/7/2026 (2886 kb)
    • A3.2 - BUILDING SECTIONS ADDN 1 Uploaded: 10/7/2026 (1866 kb)
    • A5.1 - PART ROOF PLNS ADDN 1 Uploaded: 10/7/2026 (410 kb)
    • A6.2 - 1ST FLR RFLCTD CEILING PLN - AREA C ADDN 1 Uploaded: 10/7/2026 (553 kb)
    • A6.2 1ST FLR RFLCTD CEILING PLN-AREA C ADDN 4 Uploaded: 10/7/2026 (535 kb)
    • A7.1 - RAMP STAIR - AREA B ADDN 1 Uploaded: 10/7/2026 (1324 kb)
    • A8.10 - ENLRGD INT PLNS ELVTNS ADDN 1 Uploaded: 10/7/2026 (295 kb)
    • A8.11 - ENLRGD INT PLNS ELVTNS - ADDN 1 Uploaded: 10/7/2026 (472 kb)
    • A8.13 - ENLRGD INT PLNS ELVTNS-TOILET RMS ADDN 1 Uploaded: 10/7/2026 (487 kb)
    • A9.2 - ALUMINUM FRAME SYSTEMS DTLS ADDN 1 Uploaded: 10/7/2026 (392 kb)
    • AD1.0 - OA DEMO FLR PLNS ADDN 1 Uploaded: 10/7/2026 (1590 kb)
    • AD1.3 - 1ST FLR DEMO PLN-AREA C ADDN 1 Uploaded: 10/7/2026 (552 kb)
    • AD1.3 1ST FLR DEMO PLN -AREA C ADDN 2 Uploaded: 10/7/2026 (556 kb)
    • AD1.3 1ST FLR DEMO PLN-AREA C ADDN 4 Uploaded: 10/7/2026 (539 kb)
    • ADDN 2 Uploaded: 10/7/2026 (801 kb)
    • C4.0 - GRADING DRAINAGE PLN-4 ADDN 1 Uploaded: 10/7/2026 (990 kb)
    • C4.0 GRADING DRAIN PLN ADDN 2 Uploaded: 10/7/2026 (1007 kb)
    • E0.1 LEGENDS ABBR ADDN 2 Uploaded: 10/7/2026 (275 kb)
    • E1.1 1ST FLR PLN-AREA B-PWR ADDN 2 Uploaded: 10/7/2026 (515 kb)
    • E1.1 1ST FLR PLN-AREA B-PWR ADDN 4 Uploaded: 10/7/2026 (487 kb)
    • E1.2 1ST FLR PLN-AREA C-PWR ADDN 4 Uploaded: 10/7/2026 (543 kb)
    • E1.3 1ST FLR PLN-AREA F-PWR ADDN 2 Uploaded: 10/7/2026 (371 kb)
    • E1.7 1ST FLR PLN-AREA D ADDN 2 Uploaded: 10/7/2026 (243 kb)
    • E2.0 LIGHT FIXTURE SCHED ADDN 2 Uploaded: 10/7/2026 (247 kb)
    • E2.1 1ST FLR PLN-AREA B-LIGHTING ADDN 2 Uploaded: 10/7/2026 (367 kb)
    • E2.2 1ST FLR PLN-AREA C-LIGHTING ADDN 2 Uploaded: 10/7/2026 (550 kb)
    • E2.2 1ST FLR PLN-AREA C-LIGHTING ADDN 4 Uploaded: 10/7/2026 (550 kb)
    • E3.1 1ST FLR PLN-AREA B-FIRE ALARM ADDN 2 Uploaded: 10/7/2026 (316 kb)
    • E3.1 1ST FLR PLN-AREA B-FIRE ALARM ADDN 6 Uploaded: 10/7/2026 (366 kb)
    • E3.2 1ST FLR PLN-AREA C-FIRE ALARM ADDN 2 Uploaded: 10/7/2026 (505 kb)
    • E3.2 1ST FLR PLN-AREA C-FIRE ALARM ADDN 4 Uploaded: 10/7/2026 (500 kb)
    • E3.2 1ST FLR PLN-AREA C-FIRE ALARM ADDN 6 Uploaded: 10/7/2026 (568 kb)
    • E6.1 ELECT DTLS ADDN 2 Uploaded: 10/7/2026 (292 kb)
    • E7.1 MECH EQUIPMENT SCHED ADDN 2 Uploaded: 10/7/2026 (316 kb)
    • E7.2 PANELBOARD SCHED ADDN 2 Uploaded: 10/7/2026 (328 kb)
    • E7.2 PANELBOARD SCHED ADDN 4 Uploaded: 10/7/2026 (279 kb)
    • ED1.1 1ST FLR PLN-AREA B-DEMO ADDN 2 Uploaded: 10/7/2026 (349 kb)
    • ED1.2 1ST FLR PLN-AREA C-DEMO ADDN 4 Uploaded: 10/7/2026 (334 kb)
    • M1.1 1ST FLR PLN-AREA B ADDN 2 Uploaded: 10/7/2026 (349 kb)
    • M1.1 1ST FLR PLN-AREA B ADDN 3 Uploaded: 10/7/2026 (359 kb)
    • M1.2 1ST FLR PLN-AREA C ADDN 2 Uploaded: 10/7/2026 (432 kb)
    • M1.2 1ST FLR PLN-AREA C ADDN 3 Uploaded: 10/7/2026 (448 kb)
    • M1.4 ROOF PART PLN ADDN 2 Uploaded: 10/7/2026 (169 kb)
    • M1.4 ROOF PT PLN ADDN 3 Uploaded: 10/7/2026 (180 kb)
    • M1.5 ROOF PART PLN ADDN 2 Uploaded: 10/7/2026 (197 kb)
    • M1.5 ROOF PT PLN ADDN 3 Uploaded: 10/7/2026 (206 kb)
    • M2.1 1ST FLR PLN-AREA B ADDN 2 Uploaded: 10/7/2026 (297 kb)
    • M2.1 1ST FLR PLN-AREA B-ADDN 3 Uploaded: 10/7/2026 (308 kb)
    • M2.2 1ST FLR PLN-AREA C ADDN 2 Uploaded: 10/7/2026 (308 kb)
    • M2.2 1ST FLR PLN-AREA C-ADDN 3 Uploaded: 10/7/2026 (326 kb)
    • M9.1 AHU SCHED ADDN 2 Uploaded: 10/7/2026 (630 kb)
    • MD1.2 1ST FLR DEMO-AREA C ADDN 2 Uploaded: 10/7/2026 (282 kb)
    • MD2.2 1ST FLR DEMO -AREA C-HVAC PIPING ADDN 2 Uploaded: 10/7/2026 (182 kb)
    • P1.1 FNDTN PLN -AREA B ADDN 2 Uploaded: 10/7/2026 (226 kb)
    • P1.10 PART FLR PLN ADDN 2 Uploaded: 10/7/2026 (221 kb)
    • P1.11 PART FLR PLN ADDN 2 Uploaded: 10/7/2026 (226 kb)
    • P1.12 PART FLR PLN ADDN 2 Uploaded: 10/7/2026 (281 kb)
    • P1.2 FNDTN PLN-AREA C ADDN 2 Uploaded: 10/7/2026 (252 kb)
    • P1.5 PART 1ST FLR PLN-AREA B ADDN 2 Uploaded: 10/7/2026 (279 kb)
    • P1.6 PART 1ST FLR PLN-AREA C ADDN 2 Uploaded: 10/7/2026 (303 kb)
    • PD1.2 FNDTN PLN DEMO-AREA C ADDN 2 Uploaded: 10/7/2026 (249 kb)
    • PD1.4 FNDTN 1ST FLR PLN DEMO-AREA G ADDN 4 Uploaded: 10/7/2026 (304 kb)
    • PD1.5 1ST FLR DEMO-AREA B ADDN 2 Uploaded: 10/7/2026 (258 kb)
    • PD1.5 1ST FLR DEMO-AREA B ADDN 4 Uploaded: 10/7/2026 (263 kb)
    • PD1.6 1ST FLR DEMO-AREA C ADDN 2 Uploaded: 10/7/2026 (262 kb)
    • PD1.9 2ND FLR PLN DEMO-AREA G ADDN 4 Uploaded: 10/7/2026 (223 kb)
    • Thumbs-2 Uploaded: 10/7/2026 (112 kb)
  • Specifications
    • ACT 114 FINGERPRINTING REPORT Uploaded: 9/18/2026 (140 kb)
    • ADDITIONAL REPORT OF GEOTECHNICAL INVESTIGATION Uploaded: 9/18/2026 (8819 kb)
    • ADVERTISEMENT FOR BIDS Uploaded: 9/18/2026 (578 kb)
    • AGREEMENT OF SURETY Uploaded: 9/18/2026 (288 kb)
    • AHERA INSPECTION REPORT Uploaded: 9/18/2026 (3688 kb)
    • ALTERNATES FORM Uploaded: 9/18/2026 (390 kb)
    • BID BOND FORM AIA DOCUMENT A310-2010 Uploaded: 9/18/2026 (869 kb)
    • BID FORM - STIPULATED SUM Uploaded: 9/18/2026 (618 kb)
    • BID SECURITY FORM Uploaded: 9/18/2026 (156 kb)
    • BID SUBMITTAL CHECKLIST Uploaded: 9/18/2026 (352 kb)
    • CONDITIONS OF THE CONTRACT - SPECIAL CONDITIONS Uploaded: 9/18/2026 (2383 kb)
    • CONTRACTORS QUALIFICATION STATEMENT Uploaded: 9/18/2026 (3523 kb)
    • CONTRACTORS QUALIFICATION STATEMENT AIA A305-2020 Uploaded: 9/18/2026 (1701 kb)
    • Cover and Table of Contents Uploaded: 9/18/2026 (1434 kb)
    • DIVISION 01 - GENERAL REQUIREMENTS Uploaded: 9/18/2026 (50650 kb)
    • DIVISION 02 - EXISTING CONDITIONS Uploaded: 9/18/2026 (4328 kb)
    • DIVISION 03 - CONCRETE Uploaded: 9/18/2026 (8090 kb)
    • DIVISION 04 - MASONRY Uploaded: 9/18/2026 (9107 kb)
    • DIVISION 05 - METALS Uploaded: 9/18/2026 (13963 kb)
    • DIVISION 06 - WOOD PLASTICS COMPOSITES Uploaded: 9/18/2026 (5341 kb)
    • DIVISION 07 - THERMAL AND MOISTURE PROTECTION Uploaded: 9/18/2026 (32227 kb)
    • DIVISION 08 - OPENINGS Uploaded: 9/18/2026 (27809 kb)
    • DIVISION 09 - FINISHES Uploaded: 9/18/2026 (27207 kb)
    • DIVISION 10 - SPECIALTIES Uploaded: 9/18/2026 (16877 kb)
    • DIVISION 11 - EQUIPMENT Uploaded: 9/18/2026 (798 kb)
    • DIVISION 12 - FURNISHING Uploaded: 9/18/2026 (5150 kb)
    • DIVISION 22 - PLUMBING Uploaded: 9/18/2026 (44360 kb)
    • DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING Uploaded: 9/18/2026 (94243 kb)
    • DIVISION 26 - ELECTRICAL Uploaded: 9/18/2026 (41050 kb)
    • DIVISION 27 - COMMUNICATIONS Uploaded: 9/18/2026 (8851 kb)
    • DIVISION 28 - ELECTRONIC SAFETY AND SECURITY Uploaded: 9/18/2026 (9820 kb)
    • DIVISION 31 - EARTHWORK Uploaded: 9/18/2026 (7272 kb)
    • DIVISION 32 - EXTERIOR IMPROVEMENTS Uploaded: 9/18/2026 (11063 kb)
    • DIVISION 33 - UTILITIES Uploaded: 9/18/2026 (7349 kb)
    • EROSION SEDIMENT POLLUTION CONTROL REPORT Uploaded: 9/18/2026 (26726 kb)
    • EXISTING CONDITION INFORMATION Uploaded: 9/18/2026 (270 kb)
    • EXISTING HAZARDOUS MATERIAL INFORMATION Uploaded: 9/18/2026 (291 kb)
    • GENERAL CONDITIONS AIA DOCUMENT A201-2007 Uploaded: 9/18/2026 (40977 kb)
    • GEOTECHNICAL DATA Uploaded: 9/18/2026 (282 kb)
    • INSTRUCTIONS TO BIDDERS Uploaded: 9/18/2026 (5635 kb)
    • LIST OF DRAWING SHEETS Uploaded: 9/18/2026 (884 kb)
    • MAINTENANCE BOND FORM Uploaded: 9/18/2026 (320 kb)
    • NON-COLLUSION AFFIDAVIT OF PRIME BIDDER Uploaded: 9/18/2026 (360 kb)
    • NPDES PERMIT Uploaded: 9/18/2026 (13880 kb)
    • PA CHILD ABUSE HISTORY CLEARANCE FORM Uploaded: 9/18/2026 (1881 kb)
    • PAYMENT BOND Uploaded: 9/18/2026 (485 kb)
    • PDE-6004 ARREST-CONVICTION REPORT CERTIFICATION FORM Uploaded: 9/18/2026 (1225 kb)
    • PERFORMANCE BOND Uploaded: 9/18/2026 (1309 kb)
    • PERMIT APPLICATION Uploaded: 9/18/2026 (237 kb)
    • POST CONSTRUCTION STORMWATER MANAGEMENT REPORT Uploaded: 9/18/2026 (71195 kb)
    • PRE-BID MEETINGS Uploaded: 9/18/2026 (388 kb)
    • PRELIMINARY SCHEDULE- MILESTONE SCHEDULE Uploaded: 9/18/2026 (363 kb)
    • PROCUREMENT SUBSTITUTION PROCEDURES Uploaded: 9/18/2026 (781 kb)
    • PROJECT TITLE PAGE Uploaded: 9/18/2026 (251 kb)
    • PUBLIC WORKS EMPLOYMENT VERIFICATION FORM Uploaded: 9/18/2026 (579 kb)
    • RELEASE OF LIENS Uploaded: 9/18/2026 (242 kb)
    • REPORT OF GEOTECHNICAL INVESTIGATION Uploaded: 9/18/2026 (11361 kb)
    • REQUEST FOR CRIMINAL RECORD CHECK FORM ACT 34 Uploaded: 9/18/2026 (307 kb)
    • REQUEST FOR TAXPAYER ID NUMBER AND CERTIFICATION Uploaded: 9/18/2026 (4448 kb)
    • RFI REQUEST FORM Uploaded: 9/18/2026 (155 kb)
    • STANDARD FORM OF AGREEMENT BETWEEN OWNER-CONTRACTOR AIA DOCUMENT A101-2007 Uploaded: 9/18/2026 (4192 kb)
    • SUBSTITUTION REQUEST Uploaded: 9/18/2026 (447 kb)
    • Thumbs-1 Uploaded: 9/18/2026 (29 kb)
    • UNIT PRICES FORM Uploaded: 9/18/2026 (809 kb)
    • UNIT-COST ALLOWANCE FORM Uploaded: 9/18/2026 (241 kb)
    • _Volume 01 PO Uploaded: 9/18/2026 (258752 kb)
    • _Volume 02 P O Uploaded: 9/18/2026 (151628 kb)
    • _Volume 03 PO Uploaded: 9/18/2026 (224782 kb)

Project Info

Project # 26027
Project Name GC - Warrior Run JR-SR High School
Location Warrior Run School District
Address Map It 4800 Susquehanna Trail
City Turbotville
State PA
Zip 17772
Bid Date October 20, 2026
Bid Time 10:00 AM
 
Scope This multi prime prevailing wage project constists of adding two small additions to the existing Warrior Run Jr. / Sr. High School.  In addition to the additions there is select interior renovations and misc. site upgrades. 

We are requesting prices for the following scopes of work:

Division 2 - Existing Conditions
02 41 16 Structure Demolition
02 41 19 Selective Demolition

Division 3 - Concrete
03 30 00 Cast in Place Concrete
03 54 16 Hydraulic Cement Underlayment

Division 04 - Masonry
04 20 00 Unit Masonry
04 72 00 Cast Stone Masonry

Division 5 - Metals
05 12 00 Structural Steel Framing
05 21 00 Steel Joist Framing
05 31 00 Steel Decking
05 40 00 Cold Formed Metal Framing
05 50 00 Metal Fabrications
05 52 13 Pipe and Tube Railings

Division 6 - Wood, Plastics & Composites
06 10 53 Miscellaneous Rough Carpentry
06 16 00 Sheathing
06 20 23 Interior Finish Carpentry

Division 7 - Thermal and Moisture Protection
07 11 13 Bituminous Dampproofing
07 21 00 Thermal Insulation
07 21 19 Foamed in Place Insulation
07 27 26 Fluid Applied Membrane Air Barriers
07 53 23 EPDM Roofing
07 62 00 Sheet Metal Flashing and Trim
07 71 00 Roof Specialties
07 81 00 Applied Fire Protection
07 81 23 Intumescent Fire Protection
07 84 13 Penetration Firestopping
07 84 43 Joint Firestopping
07 92 00 Joint Sealants
07 95 13.13 Interior Expansion Joint Cover Assemblies

Division 8 - Openings
08 11 13 HM Doors and Frames
08 14 16 Flush Wood Doors
08 33 23 Overhead Coiling Doors
08 41 13 Aluminum Framed Entrances and Storefronts
08 56 53 Security Windows
08 71 00 Door Hardware
08 87 00 Architectural Window Films
08 88 13 Fire RatedGlazing
08 91 19 Fixed Louvers

Division9 - Finishes
09 22 16 Non Structural Metal Framing
09 29 00 Gypsum Board
09 30 00 Tiling
09 51 33 Acoustical Panel Ceilings
09 65 13 Resilient Base and Accessories
09 65 19 Resilient Tile Flooring
09 65 66 Resilient Athletic Flooring
09 66 23 Resinous Matrix Terrazzo Flooring
09 67 23 Resinous Flooring
09 68 13 Tile Carpeting
09 77 16 Framed Decorative Panel Systm
09 91 13 Exterior Painting
09 91 23 Interior Painting
09 96 46 Intumescent Painting

Division 10 - Specialties
10 11 00 Visual Display Units
1012 00 Display Cases
10 14 16 Plaques
10 14 19 Dimensional Letter Signage
10 14 23 Panel Signage
10 21 13.19 Plastic Toilet Compartment
10 26 00 Wall Protection
10 28 00 Toilet, Bath, and Laundry Accessories
10 44 13 Fire Protection Cabinets
10 51 13 Plastic Lockers
10 53 00 Hanger Rod Canopy
10 82 00 Louvered Roof Top Equipment Screens

Division 11 - Equipment
11 30 13 Residential Applinces

Division 12 - Furnishings
12 24 13 Roller Window Shades
12 35 40 P-Lam Casework
12 36 61 Solid Surface Panels

Division 31 - Earthwork
31 00 00 Site Clearing
31 20 00 Earth Moving

Division 32 - Exterior Improvements
32 11 00 Unbound Pavement Base Coarses and Aggregates
32 12 16 Asphalt Paving
32 13 13 Concrete Paving
32 13 73 Concrete Paving Joint Sealants
32 30 00 Site Improvements and Amenities
32 31 13 Chain Link Fences and Gates
32 92 00 Turf and Grasses

Division 33 - Utilities
33 41 00 Storm Utility Drainage Piping
33 46 00 Subdrainage
Plans
Other Info There are multiple unit prices and alternates associated with this project, please check the bid form to see which ones apply to your scope of work.

Notices

If you are looking for attached files related to a Notice, go back to the Home tab ("Project Files" are on the right side).
Title Created By Created On
General Construction Emma Robinson 9/18/2026
Notice of Addendum 1 Emma Robinson 9/22/2026
Notice of Addendum 2 Emma Robinson 9/28/2026
Notice of Addendum 3 and Bid Extension Emma Robinson 9/29/2026
Notice of Addendum 4 Emma Robinson 10/5/2026
Notice of Addendum 5 Emma Robinson 10/5/2026
Notice of Addendum 6 and Bid Extension Valerie Slagle 10/7/2026

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@preconsuite.com or call 949-222-0400.