Project Info
|
Project # |
K-25-2218-DBB-3-A |
Project Name
|
San Diego - Hollister Quarry Wetland Mitigation
|
Location
|
San Diego, CA
|
Address
|
Map It
Approx. 1,300 feet South of Main Street and 200 feet East of Hollister Street
|
City
|
San Diego
|
State
|
CA
|
Zip
|
|
Bid Date
|
January 23, 2025
|
Bid Time
|
2:00 PM
|
|
|
Scope |
General Work Description: The Project consists of the re-establishment and rehabilitation of riparian scrub habitats for wetland mitigation credits by removing quarry spoils and the dominant and highly invasive non-native giant reed (Arundo donax), lowering of existing uplands (disturbed land) adjacent to (and south of) the existing riverbed to expand the area capable of supporting wetland hydrology and vegetation, and planting/seeding with native species typical of southern willow scrub and mule fat scrub vegetation communities. Re-establishment and rehabilitation shall be conducted within the designated mitigation site (and utilize the designated staging area) at locations identified on the Construction Documents.
|
Plans |
Plans, specifications, and addendums are available for viewing at no cost through the following: Our Office – 2790 Business Park Drive, Vista, CA 92081 San Diego PlanetBids Website: https://vendors.planetbids.com/portal/17950/bo/bo-detail/124538 Project Website: https://projects.pipelinesuite.com/ehPipelineSubs/dspOpenProject/projectID/310553
|
Other Info |
Quotations will be broken down into comparable packages as reasonably necessary. Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. Granite is an Equal Opportunity Employer.
Requirements: Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Granite may assist with the bond premium up to 1%. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Granite’s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/standard-agreements
Subcontractors must also be registered with a current DIR number. (No bid shall be accepted, nor any subcontract entered into without proof of the Subcontractor’s current registration to perform public work pursuant to Section 1725.5.) https://www.dir.ca.gov/Public-Works/Contractor-Registration.html
|
|