VCTC - Sespe Creek Overflow Railroad Bridge Repair

Project Files

  • 01Granite Agreements and Insurance Requirements
    • Granite Insurance Requirements Job Specific 2025.pdf Uploaded: 4/23/2025 (238 kb)
    • Professional_Services_Agreement.pdf Uploaded: 4/23/2025 (238 kb)
    • Project_Subcontract_Agreement.pdf Uploaded: 4/23/2025 (258 kb)
    • Purchase_Order_Long_Form.pdf Uploaded: 4/23/2025 (278 kb)
    • Purchase_Order_Short_Form.pdf Uploaded: 4/23/2025 (305 kb)
  • 2025.04.04_Item-9D_Sespe-IFB_2_Attachment-A_Geotechnical-Report-w-Memo.pdf Uploaded: 4/15/2025 (18085 kb)
  • 2025.04.04_Item-9D_Sespe-IFB_3_Attachment-B_Hydraulics-Report.pdf Uploaded: 4/15/2025 (7210 kb)
  • 2025.04.04_Item-9D_Sespe-IFB_4_Attachments-C-thru-I.pdf Uploaded: 4/15/2025 (5457 kb)
  • 2025.04.04_Item-Sespe-IFB_1_IFB-and-Contract-Template-with-Exhibits-1-thru-4-Drawings-and-Spe.pdf Uploaded: 4/15/2025 (10091 kb)
  • Price-File-v2.xlsx Uploaded: 4/15/2025 (59 kb)

Project Info

Project # SPBL-2025-01
Project Name VCTC - Sespe Creek Overflow Railroad Bridge Repair
Location Fillmore, CA
Address Map It Old Telegraph Road
City Fillmore
State CA
Zip
Bid Date May 16, 2025
Bid Time 3:00 PM
 
Scope
  The Sespe Creek Overflow Railroad Bridge is located on the SPBL at approximately Mile Post 423.44, just upstream of Old Telegraph Road, west of the City of Fillmore, California. The bridge was constructed in 1969 and has a total length of 450 feet, vertical clearance of 14 feet, and 15 spans of 29 feet-10 inches each.  On the early morning of January 10, 2023, heavy rain, stream flow, and debris accumulated during a series of storms and washed out three spans, or approximately 90 feet, of the bridge. Three spans and an abutment on the western end of the bridge were destroyed and require reconstruction to restore predisaster design, capacity, and function to restore rail service. An atmospheric river storm in early February 2024 caused an additional approximately 50 feet of earth and rock to erode behind the west abutment, leaving the railroad track structure further unsupported. In September – October 2024, emergency repairs were made to stabilize the embankment and remove suspended railroad tracks and ties. Permanent bridge repair is necessary to reconnect the Fillmore-Piru segment with the remainder of the Santa Paula Branch Line and restore the connection to the mainline at Montalvo/East Ventura.  The Sespe Creek Overflow Railroad Bridge Repair project (Project) would repair the damaged section of the Sespe Creek Overflow railroad bridge and repair erosion beneath the track structure west of the new abutment in alignment with final designs, plans, and specifications.

Granite is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for ALL bid items, including but not limited to those in conjunction with Caltrans work classification codes:
C0652 REINFORCING BAR SECTION SUPPLIER; C0655 STEEL SUPPLIER; C0657 LUMBER SUPPLIER; C1200 CONSTRUCTION AREA SIGNS; C1201 TRAFFIC CONTROL SYSTEM; C1532 REMOVE CONCRETE; C1575 REMOVE BRIDGE ITEM; C1580 MODIFY BRIDGE ITEM; C1601 CLEARING & GRUBBING; C1901 ROADWAY EXCAVATION; C1910 GRADING; C1920 STRUCTURE EXCAVATION; C1930 STRUCTURE BACKFILL; C1970 EMBANKMENT CONSTRUCTION; C1980 IMPORTED BORROW; C2201 FINISHING ROADWAY; C3901 ASPHALT CONCRETE; C3910 PAVING ASPHALT (ASPHALT CONCRETE); C4040 CLEAN & SEAL PAVEMENT JOINTS – ROUT & SEAL CRACKS; C4101 PAVEMENT SUBSEALING & JACKING; C4904 DRILLED HOLE; C4906 CAST-IN-DRILLED-HOLE CONCRETE PILING; C5100 CONCRETE STRUCTURE; C5120 FURNISH PRECAST CONCRETE DECK UNIT; C5124 ERECT PRECAST CONCRETE; C5190 JOINT SEAL – WATER STOP; C5201 REINFORCING STEEL; C5401 WATERPROOFING; C5501 STEEL STRUCTURES; C5701 LUMBER & TIMBER; C5900 CLEAN & PAINT STEEL; C6101 RAILROAD WORK; C6120 RAIL VEHICLE/RAILROAD QUALITY ASSURANCE INSPECTION; C6121 RAILROAD TRACK INSPECTION; C7200 ROCK SLOPE PROTECTION; C7301 CONCRETE CURB & SIDEWALK- MISC; C7505 MISC BRIDGE METAL PUMPING PLANT METAL; C7602 SAW CUTTING; C8000 FENCING; C8722 ENVIRONMENTAL ENGINEER; C8733 CONSTRUCTION ENGINEERING & INSPECTION SERVICES; C8794 ENVIRONMENTAL – WATER QUALITY; C8795 ENVIRONMENTAL – REGULATORY; C8851 LEAD COMPLIANCE; C8852 SWPPP PLANNING; C9602 BOTTOM DUMP TRUCKING; C9603 TRANSFER DUMP TRUCK; C9604 SUPER 10 DUMP TRUCK; C9605 FLAT BED TRUCKING; C9606 WATER TRUCK; C9607 END DUMP TRUCK; C9609 STREET SWEEPING TRUCK; C9632 HAZARDOUS SUBSTANCE REMOVAL; C9633 HAZARDOUS WASTE TRUCKING; C9903 CONSTRUCTION CLEAN UP; C9904 CORING; C9905 CUTTING; C9906 SANDBLASTING; C9907 CONSTRUCTION EQUIPMENTAL RENTAL; C9908 HEAVY EQUIPMENT RENTAL; C9980 DEMOLITION.


Plans

Plans, specifications, and addendums are available for viewing at no cost through the following:
Our Office – 4820 McGrath St, #101, Ventura, CA 93003
VCTC Website - Contracts - Ventura County Transportation Commission
Project Website: 
https://projects.pipelinesuite.com/ehPipelineSubs/dspOpenProject/projectID/323143

Other Info

To receive proper consideration on bid day, please submit your quote at least 2 hours PRIOR to bid time. Thanks!

Quotations will be broken down into comparable packages as reasonably necessary.  Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project.  Granite is an Equal Opportunity Employer.

Requirements:  Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions.  100% performance and payment bonds required for the full amount of the subcontract price.  Granite may assist with the bond premium up to 1%.  Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Granite’s requirements and will be required to sign the standard Granite Subcontract AgreementA copy of the insurance requirements and agreements can be obtained by contacting the Estimator. 
All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/standard-agreements

Subcontractors must also be registered with a current DIR number.  (No bid shall be accepted, nor any subcontract entered into without proof of the Subcontractor’s current registration to perform public work pursuant to Section 1725.5.)  https://www.dir.ca.gov/Public-Works/Contractor-Registration.html



Contacts
Type Company Estimator Phone Extension Fax Email
Granite Construction Company Rob Sainsbury 805-765-6855 805-335-8912 estimating.scr@gcinc.com
Granite Construction Company Grace Fry 805-765-6855 805-335-8912 estimating.scr@gcinc.com

If you have project-related questions, please contact your contractor or use the "Submit Question" tab.
If you are having technical difficulties downloading, please email support@pipelinesuite.com or call 949-222-0400.